Swim'n Play Above Ground Swimming Pool warranty Correct, TOP Cover Ledge

Page 22
INSIDE COVER
Using a #10 x 1" sheet metal screw, attach the bottom cover to the vertical using
the hole shown at right.
Hook the underside inside part of the top cover under the ledge as shown. Then lower the top cover until it rests evenly on the ledge. Place a ¼"-14 x 1" self-tapping screw through the slot in the bottom cover and screw into the hole in the top cover. Be careful not to overtighten!
OUTSIDE FULL CONTOURED
COVER
If your pool vertical does not have a hole, simply use the cover
as a template and drill through the vertical using a 9/64" diameter drill bit, being careful not to damage the pool wall.
COVERS FOR 9" LEDGE POOLS
1/4”-20 X 3/4”
STAINLESS STEEL SCREW
Slide inside cover (the cover which will be closest to the inside of the pool) into position and place outside cover onto top of inside cover aligning the holes together with cage nut attached to the top plate and secure using the 1/4”-20 x 3/4” screw provided. The two (2) edges of the covers should be parallel. Before tightening the screws, press the two covers firmly together.
Line up the hole in bottom of cover with the hole in the vertical and fasten securely using the No. 10 x 1” self tapping sheet metal screw provided.
OUTSIDE FULL
CONTOURED COVER
6" & 7" TWO-PIECE FULL CONTOURED COVER

#10X1” SELF

TAPPING SCREW

NOTE: CAGE NUTS AND TOP COVER SCREWS NOT NEEDED FOR THIS STYLE.

CORRECT

LEDGE

COVER

BOTTOM

It is very

important

that the ledge be fitted inside the tab in the bottom cover as shown below.

Make sure that the

ledge remains in

this position.

INCORRECT

LEDGE

COVER

BOTTOM

TOP COVER

LEDGE

COVER BOTTOM 1/4”-14x1” SELF

TAPPING SCREW

22

Image 22
Contents Oval Pool Contract Installations Introduction Some Friends To Help OUTInstallation Assembly Steps Aluminum Pools Vertical Actual Pool Dimensions Clearance Size Preparing the GroundLeveling the Ground Nail Center Stake Clearance RadiusAssembling the Bottom Straps SizesBottom Rail Bottom Plate Patio Block Bottom Rail and Strap LayoutExample of Basic Layout Ground Shield Wall Guard are OptionalScrew Insert Wall Into Bottom RailsClosing the Wall Serrated Flange NUTProtect Your Liner Assemble ButtressRechecking Your Work Hold Down SheetOnly THRU-THE-WALL SkimmerEarth Mound Earth MoundCorrect Liner InstallationLiner IncorrectEZ Hook Liner Installation CoveVERTICALS, TOP Plates and Rails PRE-ASSEMBLY of TOP PlatesVertical Buttress Rail Installing Ledges Placement of Warning LabelsInstalling TOP Covers 7 Deluxe TOP CoversTOP Cover Ledge 9 TWO-PIECE Wrap around Cover Pedestal Inside CoverSafety Brochures and Education Programs Pool User Warning LabelsSafety Tips Rules and Regulations Winter Care Preventative Maintenance TipsLife Saving Equipment Care of Pool WaterANY Objects That MAY Provide Access to the Pool Regina Avenue