Swim'n Play Above Ground Swimming Pool warranty EZ Hook Liner Installation, Cove

Page 17

EZ HOOK LINER INSTALLATION

ATTENTION: An 8 inch cove must be placed all around the inside of the pool

1. Clear all sticks and sharp objects from an area near the pool,

that is as large as the pool itself. Remove the liner from its

carton and unfold and open the liner. Refold the liner so that

it can easily be carried to the pool and unfold from the outside

of the pool. Check the levelness of the sand in the pool and

make sure that no sharp objects are still in the pool.

OPTIONAL

WALL

GUARD

8”

2. Place the liner into the pool while holding onto the top of the

wall section of the liner.

COVE

12”

8”

3.

Place the EZ Hook of the liner onto the top of the wall around the

 

entire pool. Temporarily place a few of the top rails over the liner

 

edging to support and sturdy the wall. Continue in this manner

 

around the entire pool.

4.

Gently pull on the liner and use a soft bristle broom to remove

 

as many wrinkles as possible on the bottom of the pool.

5.

Start filling the pool slowly with water. Continue pulling gently

 

and working the liner with a broom as needed.

6.

Some wrinkling of the liner may be evident and in no way

 

affects the structural strength of your pool. Once the water

 

is filled to a point that the liner is pressed firmly against the

 

wall install the thru-the-wall skimmer following its instructions.

 

Then you can fill the entire pool as quickly as desired.

12”

TOP RAIL

EZ HOOK

VINYL LINER

POOL WALL

OUTSIDE VIEW

OF POOL WALL

BEADED LINER INSTALLATION

1.Clear all sticks and sharp objects from an area near the pool, that is as large as the pool itself. Remove the liner from its carton and unfold and open the liner. Refold the liner so that it can easily be carried to the pool and unfold from the outside of the pool. Check the levelness of the sand in the pool and make sure that no sharp objects are still in the pool.

2.Install the bead receiver onto the top of the pool wall. Temporarily place

a few of the top rails over the bead receiver to support and sturdy the wall.

3.Place the liner into the pool while holding onto the top of the wall section of the liner.

4.Snap the bead of the liner into the bead receiver around the entire pool.

5.Gently pull on the liner and use a soft bristle broom to remove as many wrinkles as possible on the bottom of the pool.

6.Start filling the pool slowly with water. Continue pulling gently and working the liner with a broom as needed.

7.Some wrinkling of the liner may be evident and in no way affects the structural strength of your pool. Once the water is filled to a point that the liner is pressed firmly against the wall install the thru-the-wall skimmer following its instructions. Then you can fill the entire pool as quickly as desired.

17

Image 17
Contents Oval Pool Contract Installations Some Friends To Help OUT IntroductionInstallation Assembly Steps Aluminum Pools Vertical Preparing the Ground Actual Pool Dimensions Clearance SizeNail Center Stake Clearance Radius Leveling the GroundSizes Assembling the Bottom StrapsExample of Basic Layout Bottom Rail and Strap LayoutBottom Rail Bottom Plate Patio Block Ground Shield Wall Guard are OptionalClosing the Wall Insert Wall Into Bottom RailsScrew Serrated Flange NUTAssemble Buttress Protect Your LinerHold Down Sheet Rechecking Your WorkTHRU-THE-WALL Skimmer OnlyEarth Mound Earth MoundLiner Liner InstallationCorrect IncorrectCove EZ Hook Liner InstallationVertical Buttress PRE-ASSEMBLY of TOP PlatesVERTICALS, TOP Plates and Rails Rail Placement of Warning Labels Installing Ledges7 Deluxe TOP Covers Installing TOP CoversTOP Cover Ledge Inside Cover 9 TWO-PIECE Wrap around Cover PedestalPool User Warning Labels Safety Brochures and Education ProgramsSafety Tips Rules and Regulations Life Saving Equipment Preventative Maintenance TipsWinter Care Care of Pool WaterANY Objects That MAY Provide Access to the Pool Regina Avenue