Swim'n Play Above Ground Swimming Pool warranty Rail

Page 19
No. 12 x 1/2”
Sheet Metal
Screw

Insert two rails into a plate, in the same manner and using the same spacing as you have done

on the bottom rail and plate assembly. Push the rails and plate assembly onto the plastic edging leaving the far end in the air.

MAKE SURE THAT THE TOP PLATE IS CENTERED DIRECTLY ON TOP OF THE BOTTOM PLATE.

Attach the vertical to the top and bottom plate using the No.12x1/2" Sheet Metal Screws.

Insert the exposed end of a top rail into another top plate with a top rail inserted into the opposite side. Push the top plate with rails onto the edging again leaving the far end of the rail in the air. Continue in this manner all the way around the pool.

 

RAIL

PLASTIC

TOP PLATE

EDGING

 

19

Image 19
Contents Oval Pool Contract Installations Some Friends To Help OUT IntroductionInstallation Assembly Steps Aluminum Pools Vertical Preparing the Ground Actual Pool Dimensions Clearance SizeNail Center Stake Clearance Radius Leveling the GroundSizes Assembling the Bottom StrapsGround Shield Wall Guard are Optional Bottom Rail and Strap LayoutExample of Basic Layout Bottom Rail Bottom Plate Patio BlockSerrated Flange NUT Insert Wall Into Bottom RailsClosing the Wall ScrewAssemble Buttress Protect Your LinerHold Down Sheet Rechecking Your WorkTHRU-THE-WALL Skimmer OnlyEarth Mound Earth MoundIncorrect Liner InstallationLiner CorrectCove EZ Hook Liner InstallationVERTICALS, TOP Plates and Rails PRE-ASSEMBLY of TOP PlatesVertical Buttress Rail Placement of Warning Labels Installing Ledges7 Deluxe TOP Covers Installing TOP CoversTOP Cover Ledge Inside Cover 9 TWO-PIECE Wrap around Cover PedestalPool User Warning Labels Safety Brochures and Education ProgramsSafety Tips Rules and Regulations Care of Pool Water Preventative Maintenance TipsLife Saving Equipment Winter CareANY Objects That MAY Provide Access to the Pool Regina Avenue