Installation
2 - Installation
2.1 Product Description
The front panel of the MPS has a Test button, LEDs, a power connector, and one of the following Ethernet ports: a BNC connector for
“back” |
|
Centronics Connector | |
LINK AC | 100T |
TEST |
|
MPS100 | 5VDC |
“front” |
|
The LINK LED is solid green when there is a valid Ethernet network connection. The ACT (Activity) LED ßashes green or red when the server is in use. The 100 (100 MBit) LED (MPS100 only) is solid green when a
2 - 1