ASF Right And Left Edge Guide Assemblies Removal
1.Remove the auto sheet feed.
2.Remove the manual insert tray by prying one of the side frames away from it.
3.Remove the inside
4.Remove the pick roller and buckler assemblies.
5.Remove the paper load lever knob from the load lever.
6.Remove the auto sheet feed right side cover by prying up at the slots in the rear.
7.Remove the paper load lever and shaft by pulling them out from the right side of the ASF assembly. Be careful not to lose the small gear on the left end of the shaft. When you reinstall this shaft, it must be parallel with the ASF housing.
8.Pivot the guide assembly up and pry it off the back plate.
ASF Paper Load Lever Removal
1.Remove the auto sheet feed assembly.
2.Pull the paper load lever knob from the load lever.
3.Remove the auto sheet feed right side cover by prying up the slots in the rear.
4.Remove the paper load lever from the mounting stud.
Carrier Removal
1.Remove the top cover.
2.Remove the print cartridge.
3.Disconnect the print head cables from the system board. You may have to open the print head cable connectors on the system board first, then disconnect the cables.
4.Move the carrier in line with the opening in the carrier transport motor frame.
5.Reach through the opening and pull the belt from the carrier.
6.To unlock the carrier guide rod latches, rotate the rod
7.Pull the ends of the print head cables into the machine, then remove the cables from the 4 retainers in the paper guide starting from the right.
34