
Installation Considerations
10. A breaker coordination study should be performed to ensure proper handling of fault currents.
NOTE
The instantaneous trip setting of the breaker feeding the SCC bypass input should be high enough to accommodate 
Figure 1 Multi-Module  500 to 750kVA UPS
Figure 2 UPS Multi-Module  Unit block diagram
UPS MODULE
4