Black Box LB1350A, LB1351A manual Installation, Power Connection

Page 12

Black Box®LB1350A/LB1351A

8 - INSTALLATION

For Half-Rack Mount installation:

Use the optional bracket kit, affix it to the unit. Then use 4 standard bolts and nuts (not supplied), and fasten well to the rack.

Make sure to leave a gap of at least 2-3cm above the unit.

For wall mount installation

Three suitable holes on the back of the Black Box® LB1350A/LB1351A permit wall mount Installation either horizontally (preferred) or vertically.

Two holes are 188mm apart for horizontal wall mount installation, for vertical wall mount installation the two holes are 107mm apart.

Use two suitable screws having heads diameter less than 8mm

For Desktop use: Affix the supplied plastic “feet” (after peeling off the adhesive protecting sheet) to the bottom of the devices, with each “foot” approximately 1 cm from each edge.

Place the device horizontally on a hard, clean surface (desk, shelf, etc.), leaving free space around it for natural ventilation. Avoid putting the device on other active, heat generating equipment and avoid putting such devices on the Black Box®LB1350A/LB1351A

19” Rack installation

Use a standard flat shelf, install it in the rack and place one or two Black Box®LB1350A/LB1351A side by side on the shelf. Make sure to leave a gap of at least 2-3cm above the unit.

9 - POWER CONNECTION

CAUTION: When connecting a device to an AC) power outlet, always first connect the cord to the device, and ensure that it is securely fastened. Only afterward connect the cord to the wall outlet .Make sure to use grounded ( 3 way ) outlets.

For each country Black Box provides with the product an appropriate power supply cord which is safety approved in accordance with such country’s National Electric Code

Black Box®LB1350A/LB1351A

Connect AC line voltage at the rear of the converter, using the included power cord. The Black Box®LB1350A/LB1351A will accept any line voltage from 100 to 240 VAC, 50-60 Hz.

There is no ON/OFF switch on the device. When the power is connected to the device, the device is ON. This will be indicated by the POWER LED ON.

Important: following any connection or setup change (sections10,11,12 below) you must reset the device by either using S9 or by disconnecting power and reconnecting it after few seconds

12

Image 12
Contents User and Installation Guide FCC Statement Instrucciones DE Seguridad Table of contents Overview Black BoxLB1350A/LB1351A Contents of the Shipping Container Product General Description LB1350A-SCGeneral Description Black BoxLB1350A/LB1351A Parts Identification CommentsInstallation Power ConnectionFiber Optic Connection Twisted Pair Cable ConnectionConfiguration Switches Function Up Position Down CommentsAdvanced Features Port Priority Schemes Troubleshooting Down Specifications Setting Up Management Parameters PrefaceManagement parameters setup screen Network parameters Console parametersSnmp parameters Configuring the Management Station Network ConnectionManaging the Black Box LB1351A Managing with a Terminal Main menuBasic status Advanced status Device’s advanced status consistsDevice control menu Device controlPort control menus Basic port controlAdvanced port control TP port 1 basic controlBasic device control Advanced device controlManagement control menu Broadcast protectionBasic device configuration Managing with SnmpSystem info Advanced device configuration Advanced device configurationBasic port configuration User priority configurationAdvanced port configuration Snmp trapsTraps listed in bottom of screen Troubleshooting Probable CauseEuropean Union Declaration of Conformity