IBM RS/6000 SP manual Priority Component Action, SP Switch inner chassis and front chassis cables

Page 28

SP Switch environment (MAP 0600)

Table 1-4. Fan failure diagnostics

Priority

Component

Action

 

 

 

 

1

Fan 1, 2, 3, 4 or 5

a. Check specified fans for blockages or loose cable

 

 

(1 of 5)

 

 

connections.

 

b. Fix any obvious problems and continue at ªStep

 

 

 

 

 

0600-012º.

 

 

c. If you do not find any problems, continue at Priority 2.

 

 

 

 

2

Fan 1, 2, 3, 4 or 5

a. Replace fans as described in Chapter 4, ªFRU

 

 

(2 of 5)

 

 

removals and replacementsº on page 4-1.

 

b.

Continue at ªStep 0600-012º.

 

 

 

 

 

 

3

Switch supervisor card

a.

Replace the card.

 

 

(3 of 5)

 

b.

Continue at ªStep 0600-012º.

 

 

 

 

 

 

 

4

Switch supervisor control cable

a. Replace the cable. Refer to Figure 1-3, for cable

 

 

(4 of 5)

 

 

connections.

 

b. Continue at ªStep 0600-012º.

 

 

 

 

 

5

All replaced

Call next level of support.

(5 of 5)

 

 

 

 

 

 

 

Inner Chassis Cable

P4 (Power Card)

2 x 1

P5

P3

(Switch SV Card)

 

2 x 20

 

P6 (Power Card)

2 x 1

Front Chassis Cable

P7, P8 (CB)

P9 (LED)

 

 

 

 

 

 

 

 

 

 

 

 

P1

P2 (Fan 1)

P3 (Fan 2)

P4 (Fan 3)

P5 (Fan 4)

P6 (Fan 5)

2 x 2

2 x 2

2 x 2

2 x 2

2 x 2

Figure 1-3. SP Switch inner chassis and front chassis cables

Step 0600-012

You performed the recommended action in Table 1-4.

1.Component replaced or reseated.

2.Reconnect all cables inside the SP Switch.

3.Install front panel assembly and reinstall front retaining screws (see ªService position proceduresº on page 3-9).

4.Connect only power (J1) and supervisor (J2) cables at the rear of the SP Switch.

5.Put the SP Switch's circuit breaker into the On (`1') position.

1-8RS/6000 SP: SP Switch Service Guide

Image 28
Contents IBM Page IBM Fifth Edition April Contents FRU removals and replacements Figures Vi RS/6000 SP SP Switch Service Guide Tables ViiViii RS/6000 SP SP Switch Service Guide Safety and environmental notices Safety noticesRS/6000 SP SP Switch Service Guide SPSFD017 Xii RS/6000 SP SP Switch Service Guide Laser safety information Environmental notices Product recycling and disposalXiv RS/6000 SP SP Switch Service Guide Who should use this book About this bookRelated information How to send your comments Summary of changes Xviii RS/6000 SP SP Switch Service Guide Maintenance Analysis Procedures MAPs Switch description and problem determination MAP Environment Yellow Power GreenFlashing Errors in /var/adm/SPlogs/css/out.top see Priority Message or condition Action SP Switch environment MAP Condition ActionSwitch connector resistance values Step SP Switch inner chassis and front chassis cables Priority Component ActionStep 10RS/6000 SP SP Switch Service Guide Step 12RS/6000 SP SP Switch Service Guide SP Switch power MAP SP Switch power MAP PDU-BH-P1 PDU-BH-P2 PDU-BH-P3 PDU-BH-P4 PDU-BH-P5 From From P1 pinEstart SP Switch function MAPEprimary Splstdata -n pg Pg /var/adm/SPlogs/css/out.top NotesSP Switch function MAP Error # Message/condition Description and action If the cabling does not match, correct the cablingSplstdata -s pg SDRGetObjects DependentNodeL01-S00-BH-J18 E02-S00-BH-J18L03-N01 E02-N04Priority Message/condition Action Var/adm/SPlogs/css/out.top file haveStep Service Request Number Failing components DescriptionSRN 26RS/6000 SP SP Switch Service Guide Priority Failing component Action 28RS/6000 SP SP Switch Service Guide Step 30RS/6000 SP SP Switch Service Guide Estart Do not perform the cable wrap test Step Do not perform cable wrap test Step Check /var/adm/SPlogs/css/out.top file Naming standard for RS/6000 SP components LocationsFormat structure Location diagrams of the RS/6000 SP components Major assemblyFront and rear views of RS/6000 SP frame Figure notes2shows a front view of the RS/6000 SP multi-switch frame Front view of 49-inch frame locations. See notes below Frame locations Frame FRAExample E01-FRA-G1 Switch assembly locations Air BaffleConnector details Cable routing10RS/6000 SP SP Switch Service Guide Cable routing in a multi-switch frame F/C 2030/1 12RS/6000 SP SP Switch Service Guide Switch data cables Cable Part Plug from Plug to Number Location14RS/6000 SP SP Switch Service Guide Personal ESD requirements Service proceduresTools and files overview Utility see note Runs on Description FaultserviceWormRTG Rc.switchIfconfig File see note Location Description Rc.switch.logUsing the css.snap script Switch supervisor self-test Verification tests using PerspectivesNode supervisor verification Self-test Conditions Pass sequenceSwitch supervisor verification Frame supervisor verificationSelecting appropriate switch clocks Selecting the switch clock sourceDetermining the correct switch clock source EclockRemoving a switch assembly from the active configuration Removing and restoring switch resourcesNumber of Logical Master Clock Choice Model Frames Restoring a switch assembly to the active configuration Viewing switch partitionsResetting the clock and bootlist after servicing a node Replacing a switch assembly from service positionEfence of primary and primary backup nodes Installing firmware updates on SP nodes Installing adapter microcode packagesAdapter Package Running diagnostics on a switch port FRU removals and replacements Handling static-sensitive devicesRemoving the switch assembly Procedures for switch assembliesReplacing the switch assembly Replacing the switch fans Removing the switch fansRemoving the switch front chassis cable Replacing the switch front chassis cable Removing the switch supervisor cardReplacing the switch supervisor card Removing the switch inner chassis cableReplacing the switch inner chassis cable Removing the switch power cardsReplacing the switch power cards Removing the SP Switch power supply cards8RS/6000 SP SP Switch Service Guide Parts catalog SPS, SPS-8 Switch assembly feature view Assembly Part number Units Description Index 4RS/6000 SP SP Switch Service Guide Inner chassis assembly SPS includes all assembly in shaded Air flow Cable, front chassis SP Switch Data Cables SPS-8 Switch cables featureSP Switch External Cables SPS SPS-8 Parts catalog Multi-switch frame F/C 2030/1 Multi-switch frame F/C 2030/1 12RS/6000 SP SP Switch Service Guide Trademarks European Union EU statement United Kingdom telecommunications safety requirementsIndustry Canada compliance statement Electromagnetic interference EMI statement Taiwan For installations in JapanRadio protection for Germany 4RS/6000 SP SP Switch Service Guide Index Numerics ESD Switch inner chassis cable, SPS Switch partitioning 4RS/6000 SP SP Switch Service Guide How satisfied are you that the information in this book is Readers comments ± Wed like to hear from youPlease tell us how we can improve this book IBM Page IBM
Related manuals