2.In the Node pane, click the icon of the node you want to verify

3.Click the Notebookicon on the tool bar

v When the Notebook window opens, make certain that the Node Statustab is selected

4.The Node failure:attribute displays the status of the node supervisor

v Nodisplayed in a green box indicates that the node supervisor has not failed and the supervisor is responding

v Yesdisplayed in a red box indicates that the node supervisor has failed and it is not responding Note: Clicking Helpin the Notebook window's lower right corner displays attribute descriptions.

Frame supervisor verification

From the Hardware Perspectives window:

1.Unless you have saved display settings, the Hardware Perspective does not open with a frame pane displayed. To open a frame pane:

a.Click the Add Paneicon on the tool bar v The Add Pane dialog box opens

b.From the Pane Typepull down, select Frames and Switches

c.Select your choice of adding the pane to the current window or to a new window

d.If desired, enter a new pane title

e.Click OKto open the pane and close the dialog box

v You may repeat these steps to add additional frame panes

2.In the Frame and Switch pane, click the icon of the frame you want to verify

3.Click the Notebookicon on the tool bar

v When the Notebook window opens, make certain that the Frame Statustab is selected

4.The Controller responds:attribute displays the status of the frame supervisor

v OKdisplayed in a green box indicates that the frame supervisor is responding

v No responsedisplayed in a red box indicates that the frame supervisor is not responding Note: Clicking Helpin the Notebook window's lower right corner displays attribute descriptions.

Switch supervisor verification

From the Hardware Perspectives window:

1.Unless you have saved display settings, the Hardware Perspective does not open with a switch pane displayed. To open a switch pane:

a.Click the Add Paneicon on the tool bar v The Add Pane dialog box opens

b.From the Pane Typepull down, select Frames and Switches

c.Select your choice of adding the pane to the current window or to a new window

d.If desired, enter a new pane title

e.Click OKto open the pane and close the dialog box

v You may repeat these steps to add additional switch panes

2.In the Frame and Switch pane, click the icon of the switch you want to verify

v A switch icon is displayed next to the frame icon only if a switch is installed in the frame

3.Click the Notebookicon on the tool bar

v When the Notebook window opens, make certain that the Switch Statustab is selected

4.The Node failure:attribute displays the status of the switch supervisor.

v Nodisplayed in a green box indicates that the switch supervisor has not failed and the supervisor is responding to communication from the frame supervisor.

Chapter 3. Service procedures 3-5

Image 75
Contents IBM Page IBM Fifth Edition April Contents FRU removals and replacements Figures Vi RS/6000 SP SP Switch Service Guide Vii TablesViii RS/6000 SP SP Switch Service Guide Safety notices Safety and environmental noticesRS/6000 SP SP Switch Service Guide SPSFD017 Xii RS/6000 SP SP Switch Service Guide Environmental notices Product recycling and disposal Laser safety informationXiv RS/6000 SP SP Switch Service Guide About this book Who should use this bookRelated information How to send your comments Summary of changes Xviii RS/6000 SP SP Switch Service Guide Maintenance Analysis Procedures MAPs Switch description and problem determination MAP Power Green Environment YellowFlashing Priority Message or condition Action Errors in /var/adm/SPlogs/css/out.top seeCondition Action SP Switch environment MAPSwitch connector resistance values Step Priority Component Action SP Switch inner chassis and front chassis cablesStep 10RS/6000 SP SP Switch Service Guide Step 12RS/6000 SP SP Switch Service Guide SP Switch power MAP SP Switch power MAP PDU-BH-P1 PDU-BH-P2 PDU-BH-P3 PDU-BH-P4 PDU-BH-P5 From P1 pin FromSP Switch function MAP EstartEprimary Pg /var/adm/SPlogs/css/out.top Notes Splstdata -n pgSP Switch function MAP SDRGetObjects DependentNode Error # Message/condition Description and actionIf the cabling does not match, correct the cabling Splstdata -s pgE02-N04 L01-S00-BH-J18E02-S00-BH-J18 L03-N01Var/adm/SPlogs/css/out.top file have Priority Message/condition ActionStep Failing components Description Service Request NumberSRN 26RS/6000 SP SP Switch Service Guide Priority Failing component Action 28RS/6000 SP SP Switch Service Guide Step 30RS/6000 SP SP Switch Service Guide Estart Do not perform the cable wrap test Step Do not perform cable wrap test Step Check /var/adm/SPlogs/css/out.top file Locations Naming standard for RS/6000 SP componentsFormat structure Major assembly Location diagrams of the RS/6000 SP componentsFigure notes Front and rear views of RS/6000 SP frame2shows a front view of the RS/6000 SP multi-switch frame Front view of 49-inch frame locations. See notes below Frame FRA Frame locationsExample E01-FRA-G1 Air Baffle Switch assembly locationsCable routing Connector details10RS/6000 SP SP Switch Service Guide Cable routing in a multi-switch frame F/C 2030/1 12RS/6000 SP SP Switch Service Guide Cable Part Plug from Plug to Number Location Switch data cables14RS/6000 SP SP Switch Service Guide Service procedures Personal ESD requirementsTools and files overview File see note Location Description Rc.switch.log Utility see note Runs on Description FaultserviceWormRTGRc.switch IfconfigUsing the css.snap script Self-test Conditions Pass sequence Switch supervisor self-testVerification tests using Perspectives Node supervisor verificationFrame supervisor verification Switch supervisor verificationEclock Selecting appropriate switch clocksSelecting the switch clock source Determining the correct switch clock sourceRemoving and restoring switch resources Removing a switch assembly from the active configurationNumber of Logical Master Clock Choice Model Frames Viewing switch partitions Restoring a switch assembly to the active configurationReplacing a switch assembly from service position Resetting the clock and bootlist after servicing a nodeEfence of primary and primary backup nodes Installing adapter microcode packages Installing firmware updates on SP nodesAdapter Package Running diagnostics on a switch port Handling static-sensitive devices FRU removals and replacementsProcedures for switch assemblies Removing the switch assemblyReplacing the switch assembly Removing the switch fans Replacing the switch fansRemoving the switch front chassis cable Removing the switch supervisor card Replacing the switch front chassis cableRemoving the switch inner chassis cable Replacing the switch supervisor cardRemoving the switch power cards Replacing the switch inner chassis cableRemoving the SP Switch power supply cards Replacing the switch power cards8RS/6000 SP SP Switch Service Guide Parts catalog SPS, SPS-8 Switch assembly feature view Assembly Part number Units Description Index 4RS/6000 SP SP Switch Service Guide Inner chassis assembly SPS includes all assembly in shaded Air flow Cable, front chassis Switch cables feature SP Switch Data Cables SPS-8SP Switch External Cables SPS SPS-8 Parts catalog Multi-switch frame F/C 2030/1 Multi-switch frame F/C 2030/1 12RS/6000 SP SP Switch Service Guide Trademarks United Kingdom telecommunications safety requirements European Union EU statementIndustry Canada compliance statement For installations in Japan Electromagnetic interference EMI statement TaiwanRadio protection for Germany 4RS/6000 SP SP Switch Service Guide Index Numerics ESD Switch inner chassis cable, SPS Switch partitioning 4RS/6000 SP SP Switch Service Guide Readers comments ± Wed like to hear from you How satisfied are you that the information in this book isPlease tell us how we can improve this book IBM Page IBM
Related manuals
Manual 108 pages 26.79 Kb

RS/6000 SP specifications

The IBM RS/6000 SP (Scalable Power) is a high-performance computing system that was developed in the early 1990s and has since become a significant player in the realm of supercomputing and enterprise solutions. Designed primarily for scientific, engineering, and complex data analysis tasks, the RS/6000 SP provides powerful processing capabilities, enhanced scalability, and features to support demanding applications.

One of the key characteristics of the RS/6000 SP is its modular architecture, which allows for the addition of multiple nodes. Each node is based on IBM's Power architecture, leveraging the RISC (Reduced Instruction Set Computing) design to achieve high throughput and efficiency. The system can support configurations ranging from a few nodes to hundreds, enabling organizations to scale their computational power as needed based on workload requirements.

The RS/6000 SP employs advanced interconnect technologies, most notably the SP Switch, which ensures high-speed communication between nodes. This interconnect allows for seamless data transfer, ensuring that the system can handle large datasets and complex computations without bottlenecks. The SP's ability to deliver concurrent processing capabilities makes it ideal for parallel computing tasks, including simulations, modeling, and large-scale computations.

In terms of software, the RS/6000 SP was equipped with AIX, IBM's version of the UNIX operating system, which provides a stable and secure environment for enterprise applications. Furthermore, the system supports a vast array of programming languages and tools, including Fortran, C, and C++, along with libraries and frameworks designed for high-performance computing. This compatibility allows developers to optimize their applications to fully utilize the underlying hardware.

Another notable feature of the RS/6000 SP is its extensive support for various workloads, including database management, multi-user applications, and graphical processing. The system was equipped with high-performance graphics capabilities, making it suitable for tasks that require intensive visualization, such as computer-aided design (CAD) and scientific visualization.

Overall, the IBM RS/6000 SP has solidified its role in the high-performance computing landscape, combining advanced technologies, robust scalability, and flexibility to meet the unique demands of research and enterprise environments. Its legacy continues to influence modern computing architectures, embodying IBM’s commitment to innovation and performance in the pursuit of complex problem-solving capabilities.