IBM RS/6000 SP manual SP Switch power MAP, Purpose of this MAP

Page 33

SP Switch environment (MAP 0600)

Step 0600-029

You have a PSFuseGood problem that did not go away when you removed power supply PS1.

1.Put the circuit breaker in the Off (`0') position.

2.Remove power cable (J1) and supervisor cable (J2) from the rear of the SP Switch.

3.Remove the front panel assembly.

4.Replug power supply PS1 and remove power supply PS2.

5.Reinstall the SPS front panel assembly, being careful to align the guide pins on the P1 connector to the inner chassis.

6.Replug the power cable (J1) and supervisor cable (J2) at the rear of the assembly.

7.Put the circuit breaker in the On (`1') position.

8.Does the failure condition still exist?

vIf yes, go to ªStep 0600-031º.

vIf no, go to ªStep 0600-030º.

Step 0600-030

You have a PSFuseGood problem that went away when you removed power supply PS2.

1.Put the circuit breaker in the Off (`0') position.

2.Remove power cable (J1) and supervisor cable (J2) from the rear of the SP Switch.

3.Remove the front panel assembly.

4.Replace power supply PS2.

5.Take the switch out of the service position (refer to ªService position proceduresº on page 3-9).

6.Go to ªStep 0600-017º on page 1-10.

Step 0600-031

You have a PSFuseGood problem that did not go away when you removed power supply PS2.

1.Put the circuit breaker in the Off (`0') position.

2.Remove power cable (J1) and supervisor cable (J2) from the rear of the SP Switch.

3.Remove the front panel assembly.

4.Replug power supply PS2 and replace the switch supervisor card.

5.Reinstall the SPS front panel assembly, being careful to align the guide pins on the P1 connector to the inner chassis.

6.Replug the power cable (J1) and supervisor cable (J2) at the rear of the assembly.

7.Put the circuit breaker in the On (`1') position.

8.Does the failure condition still exist? v If yes:

a.Replace the SP switch inner chassis assembly.

b.Go to ªStep 0600-017º on page 1-10.

vIf no, go to ªStep 0600-017º on page 1-10.

SP Switch power (MAP 0610)

Purpose of this MAP

This MAP provides diagnostic information for problems related to the SP Switch power supply.

Note: Refer to ªService position proceduresº on page 3-9 for placing the switch into the service position or removing it from the service position.

Chapter 1. Maintenance Analysis Procedures (MAPs) 1-13

Image 33
Contents IBM Page IBM Fifth Edition April Contents FRU removals and replacements Figures Vi RS/6000 SP SP Switch Service Guide Vii TablesViii RS/6000 SP SP Switch Service Guide Safety notices Safety and environmental noticesRS/6000 SP SP Switch Service Guide SPSFD017 Xii RS/6000 SP SP Switch Service Guide Environmental notices Product recycling and disposal Laser safety informationXiv RS/6000 SP SP Switch Service Guide About this book Who should use this bookRelated information How to send your comments Summary of changes Xviii RS/6000 SP SP Switch Service Guide Maintenance Analysis Procedures MAPs Switch description and problem determination MAP Power Green Environment YellowFlashing Priority Message or condition Action Errors in /var/adm/SPlogs/css/out.top seeCondition Action SP Switch environment MAPSwitch connector resistance values Step Priority Component Action SP Switch inner chassis and front chassis cablesStep 10RS/6000 SP SP Switch Service Guide Step 12RS/6000 SP SP Switch Service Guide SP Switch power MAP SP Switch power MAP PDU-BH-P1 PDU-BH-P2 PDU-BH-P3 PDU-BH-P4 PDU-BH-P5 From P1 pin FromSP Switch function MAP EstartEprimary Pg /var/adm/SPlogs/css/out.top Notes Splstdata -n pgSP Switch function MAP If the cabling does not match, correct the cabling Error # Message/condition Description and actionSplstdata -s pg SDRGetObjects DependentNodeE02-S00-BH-J18 L01-S00-BH-J18L03-N01 E02-N04Var/adm/SPlogs/css/out.top file have Priority Message/condition ActionStep Failing components Description Service Request NumberSRN 26RS/6000 SP SP Switch Service Guide Priority Failing component Action 28RS/6000 SP SP Switch Service Guide Step 30RS/6000 SP SP Switch Service Guide Estart Do not perform the cable wrap test Step Do not perform cable wrap test Step Check /var/adm/SPlogs/css/out.top file Locations Naming standard for RS/6000 SP componentsFormat structure Major assembly Location diagrams of the RS/6000 SP componentsFigure notes Front and rear views of RS/6000 SP frame2shows a front view of the RS/6000 SP multi-switch frame Front view of 49-inch frame locations. See notes below Frame FRA Frame locationsExample E01-FRA-G1 Air Baffle Switch assembly locationsCable routing Connector details10RS/6000 SP SP Switch Service Guide Cable routing in a multi-switch frame F/C 2030/1 12RS/6000 SP SP Switch Service Guide Cable Part Plug from Plug to Number Location Switch data cables14RS/6000 SP SP Switch Service Guide Service procedures Personal ESD requirementsTools and files overview Rc.switch Utility see note Runs on Description FaultserviceWormRTGIfconfig File see note Location Description Rc.switch.logUsing the css.snap script Verification tests using Perspectives Switch supervisor self-testNode supervisor verification Self-test Conditions Pass sequenceFrame supervisor verification Switch supervisor verificationSelecting the switch clock source Selecting appropriate switch clocksDetermining the correct switch clock source EclockRemoving and restoring switch resources Removing a switch assembly from the active configurationNumber of Logical Master Clock Choice Model Frames Viewing switch partitions Restoring a switch assembly to the active configurationReplacing a switch assembly from service position Resetting the clock and bootlist after servicing a nodeEfence of primary and primary backup nodes Installing adapter microcode packages Installing firmware updates on SP nodesAdapter Package Running diagnostics on a switch port Handling static-sensitive devices FRU removals and replacementsProcedures for switch assemblies Removing the switch assemblyReplacing the switch assembly Removing the switch fans Replacing the switch fansRemoving the switch front chassis cable Removing the switch supervisor card Replacing the switch front chassis cableRemoving the switch inner chassis cable Replacing the switch supervisor cardRemoving the switch power cards Replacing the switch inner chassis cableRemoving the SP Switch power supply cards Replacing the switch power cards8RS/6000 SP SP Switch Service Guide Parts catalog SPS, SPS-8 Switch assembly feature view Assembly Part number Units Description Index 4RS/6000 SP SP Switch Service Guide Inner chassis assembly SPS includes all assembly in shaded Air flow Cable, front chassis Switch cables feature SP Switch Data Cables SPS-8SP Switch External Cables SPS SPS-8 Parts catalog Multi-switch frame F/C 2030/1 Multi-switch frame F/C 2030/1 12RS/6000 SP SP Switch Service Guide Trademarks United Kingdom telecommunications safety requirements European Union EU statementIndustry Canada compliance statement For installations in Japan Electromagnetic interference EMI statement TaiwanRadio protection for Germany 4RS/6000 SP SP Switch Service Guide Index Numerics ESD Switch inner chassis cable, SPS Switch partitioning 4RS/6000 SP SP Switch Service Guide Readers comments ± Wed like to hear from you How satisfied are you that the information in this book isPlease tell us how we can improve this book IBM Page IBM
Related manuals
Manual 108 pages 26.79 Kb

RS/6000 SP specifications

The IBM RS/6000 SP (Scalable Power) is a high-performance computing system that was developed in the early 1990s and has since become a significant player in the realm of supercomputing and enterprise solutions. Designed primarily for scientific, engineering, and complex data analysis tasks, the RS/6000 SP provides powerful processing capabilities, enhanced scalability, and features to support demanding applications.

One of the key characteristics of the RS/6000 SP is its modular architecture, which allows for the addition of multiple nodes. Each node is based on IBM's Power architecture, leveraging the RISC (Reduced Instruction Set Computing) design to achieve high throughput and efficiency. The system can support configurations ranging from a few nodes to hundreds, enabling organizations to scale their computational power as needed based on workload requirements.

The RS/6000 SP employs advanced interconnect technologies, most notably the SP Switch, which ensures high-speed communication between nodes. This interconnect allows for seamless data transfer, ensuring that the system can handle large datasets and complex computations without bottlenecks. The SP's ability to deliver concurrent processing capabilities makes it ideal for parallel computing tasks, including simulations, modeling, and large-scale computations.

In terms of software, the RS/6000 SP was equipped with AIX, IBM's version of the UNIX operating system, which provides a stable and secure environment for enterprise applications. Furthermore, the system supports a vast array of programming languages and tools, including Fortran, C, and C++, along with libraries and frameworks designed for high-performance computing. This compatibility allows developers to optimize their applications to fully utilize the underlying hardware.

Another notable feature of the RS/6000 SP is its extensive support for various workloads, including database management, multi-user applications, and graphical processing. The system was equipped with high-performance graphics capabilities, making it suitable for tasks that require intensive visualization, such as computer-aided design (CAD) and scientific visualization.

Overall, the IBM RS/6000 SP has solidified its role in the high-performance computing landscape, combining advanced technologies, robust scalability, and flexibility to meet the unique demands of research and enterprise environments. Its legacy continues to influence modern computing architectures, embodying IBM’s commitment to innovation and performance in the pursuit of complex problem-solving capabilities.