3.0 OPERATION

TESTING THE SWCA

In order to test the SWCA, it must be plugged it into an inverter that is powered up on batteries or a suitable power supply. Press the number “1”. If everything is correct, the inverter should reply with a “UNIT1” and possibly some two character codes.

©2002 Xantrex Technology Inc.

P/N 973-0022-01-01 Rev A 04/2002

19

Image 27
Contents SW Communications Adapter Swca Date and Revision About XantrexTrademarks DisclaimerUNE Tension OU Condition Important Safety InstructionsConnecting the Swca to a Computer using a Modem Return Material Authorization Policy Enlargement of Pin Assignments and Color Coding Keyboard Commands for using Terminal Viii Introduction Xantrex Technology Inc To Install the Swca InstallationAdditional Possible Requirements Connecting the Swca to a Computer using a ModemConnecting Multiple SWCAs to a Single Computer RequirementsMultiple SWCAs Installation ConcernsPositive Ground or PV Ground Fault Protection Installations Advanced Monitoring SoftwareInstallation Concerns Installation Installing the Swcps DOS Program Swca DOS Display Emulation Software Using the Swcps DOS ProgramSwca Programming Menu Function Keys and Other DisplaysKey Purpose Swca Programming Menu Function KeysAbbreviation Definition LED Control IndicatorsKeystroke Function Keyboard CommandsStarting the Program ID NumbersChanging the PC’s COM Port Number Exiting the Swcps Program Accessing Help Information from the Swcps ProgramAccessing the Setup Menu from the Swcps Program Switching Between Multiple Swca Adapters/invertersMaking a New Connection USE of the Swca with Terminal Emulation ProgramsTelephone Number Dialog Box Figure!.,%#3-5.!%##*#.%$%-###+&/0 COM Port ValuesTesting the Swca Operation Troubleshooting Troubleshooting Appendix a Product and System Information WarrantyReturn Material Procedure Return Material Authorization PolicyService Information Appendix a Product & System Information Page 360 435