Installation and Configuration

Installation

WARNING: Shock hazard

Safety requirements mandate that this equipment not be serviced while energized. Power sources for the inverter must be locked-out and tagged (see “De-Energize/Isolation Procedure (Shutdown)”) prior to servicing. A padlock and tag should be installed on each energy source prior to servicing.

Equipment Required

Inverter Enclosure Key (7mm triangle key)

Small flathead screwdriver

Wire cutter or scissors to trim cable ties

Ratchet with 10mm socket or 10mm nutdriver

De-Energize/Isolation Procedure (Shutdown)

WARNING: Shock hazard

The terminals of the PV input may be energized if the arrays are energized. In addition, allow 5 minutes for all capacitors within the enclosure to discharge after disconnecting the Grid Tie Inverter from AC and DC sources.

Use the following procedure to isolate and de-energize the Inverter for maintenance:

1.Turn the main ON/OFF switch (S3) to the OFF position.

2.Open the utility connection circuit breaker.

3.Open the AC disconnect.

4.Open the DC disconnect switch.

5.Install lockout devices on the utility connection circuit breaker, AC and DC disconnect switch.

2

153553

For use by qualified technicians only

Image 16
Contents GT Series Three Phase Ethernet Communications Kit Page GT Series Three Phase Ethernet Communications Kit Date and Revision About This Guide PurposeScope Audience OrganizationConventions Used Related InformationImportant Safety Instructions Save These Instructions do not DiscardRisks General Safety Precautions Personal SafetySafety Equipment Qualified PersonnelOperational Safety Procedures Lockout and TagPV Terminals TB3, TB4, and TB5 PV GND Interconnection Standards Compliance De-Energize/Isolation ProcedureIntended Use Contents Xii Installation and Configuration Interface RequirementsDe-Energize/Isolation Procedure Shutdown InstallationEquipment Required Installing the Ethernet Communications Kit Panel with Four M6 NutsEthernet Kit Cable Connections Energize Procedure Startup ConfiguringLAN Interface Set-up Configuring the LAN Interface Ethernet Communications Kit Configuration DiagramWarranty and Return Information WarrantyWarranty and Return DisclaimerReturn Procedure Return Material Authorization PolicyExclusions Out of Warranty Service Page Xantrex Technology Inc