Xantrex Technology GT Series manual Important Safety Instructions

Page 7

Important Safety Instructions

SAVE THESE INSTRUCTIONS - DO NOT DISCARD

This manual contains important safety instructions for the GT Series Three Phase Ethernet Communications Kit that must be followed during installation and maintenance procedures.

WARNING: Shock Hazard

Read and keep this Installation Guide for future reference.

Before operating and maintaining the Ethernet Communications Kit, read all instructions, cautionary markings, and all other appropriate sections of this manual. Failure to adhere to these warnings could result in severe shock or possible death. Exercise extreme caution at all times to prevent accidents.

WARNING: Shock Hazard

The Inverter Enclosures contain exposed high voltage conductors. The Inverter enclosure doors should remain closed with the latches tightened, except during maintenance or testing. These servicing instructions are for use by qualified personnel who meet all local and governmental code requirements for licensing and training for the installation of Electrical Power Systems with AC and DC voltage to 600 volts. To reduce the risk of electric shock, do not perform any servicing other than that specified in the installation instructions unless you are qualified to do so. Do not open the cabinet doors if extreme moisture is present (rain or heavy dew).

WARNING: Lethal Voltage

In order to remove all sources of voltage from the Inverter, the incoming power must be de-energized at the source. This may be done at the main utility circuit breaker and by opening the AC Disconnect and the DC Disconnect Switch on the Ethernet Communications Kit. Review the system configuration to determine all of the possible sources of energy. In addition, allow five minutes for the DC bus capacitors to discharge after removing power. Follow the “Lockout and Tag” procedure on page viii to de-energize the Ethernet Communications Kit.

WARNING: Shock hazard

If a ground fault has occurred, there may be potential between TB4 and GND. The normally grounded pole may be energized and ungrounded.

v

This guide for use by qualified personnel only

Image 7
Contents GT Series Three Phase Ethernet Communications Kit Page GT Series Three Phase Ethernet Communications Kit Date and Revision Organization About This GuidePurpose Scope AudienceRelated Information Conventions UsedSave These Instructions do not Discard Important Safety InstructionsRisks Qualified Personnel General Safety PrecautionsPersonal Safety Safety EquipmentLockout and Tag Operational Safety ProceduresPV Terminals TB3, TB4, and TB5 PV GND Interconnection Standards Compliance De-Energize/Isolation ProcedureIntended Use Contents Xii Interface Requirements Installation and ConfigurationDe-Energize/Isolation Procedure Shutdown InstallationEquipment Required Panel with Four M6 Nuts Installing the Ethernet Communications KitEthernet Kit Cable Connections Energize Procedure Startup ConfiguringLAN Interface Set-up Ethernet Communications Kit Configuration Diagram Configuring the LAN InterfaceWarranty Warranty and Return InformationDisclaimer Warranty and ReturnReturn Procedure Return Material Authorization PolicyExclusions Out of Warranty Service Page Xantrex Technology Inc