Configuring

Energize Procedure (Startup)

Use the following procedure to turn on the Inverter:

1.Remove any lockout devices from the utility connection circuit breaker and PV disconnect switch.

2.Close the utility connection circuit breaker.

3.Close the AC disconnect.

4.Close the DC disconnect switch.

5.Turn the ON/OFF switch (S3) to the ON position.

After a short initialization period, the Inverter will automatically transition to ‘Waking Up’, given the PV voltage is greater than the PV V Start set point.

Configuring

 

The Ethernet Communications Kit IP address and configuration are

 

required before installing into the inverter.

 

The configuration can be performed from any desktop or laptop

 

computer.

Hardware

DB25 Male to DB9 Female modem cable.

Software

NPORT Management Suite (supplied on the NPort Installation CD)

 

MOXA PComm Program (http://web4.moxa.com/support/download.asp)

LAN Interface Set-up

To set-up the Ethernet Communications Kit:

1.Plug the power adapter's DC plug into Ethernet Communications Kit's DC-IN jack.

2.Plug the power adapter into an electrical outlet.

3.Connect the DB25 male connector of the modem cable to the Ethernet Communications Kit's serial connector.

4.Connect the DB9 female connector of the modem cable to a PC RS232 port (COMM port).

5.Connect the ethernet cable from the Ethernet Communications Kit's 10BaseT Ethernet connector to the LAN network

153553

5

For use by qualified technicians only

Image 19
Contents GT Series Three Phase Ethernet Communications Kit Page GT Series Three Phase Ethernet Communications Kit Date and Revision Organization About This GuidePurpose Scope AudienceRelated Information Conventions UsedSave These Instructions do not Discard Important Safety InstructionsRisks Qualified Personnel General Safety PrecautionsPersonal Safety Safety EquipmentLockout and Tag Operational Safety ProceduresPV Terminals TB3, TB4, and TB5 PV GND Interconnection Standards Compliance De-Energize/Isolation ProcedureIntended Use Contents Xii Interface Requirements Installation and ConfigurationDe-Energize/Isolation Procedure Shutdown InstallationEquipment Required Panel with Four M6 Nuts Installing the Ethernet Communications KitEthernet Kit Cable Connections Energize Procedure Startup ConfiguringLAN Interface Set-up Ethernet Communications Kit Configuration Diagram Configuring the LAN InterfaceWarranty Warranty and Return InformationDisclaimer Warranty and ReturnReturn Procedure Return Material Authorization PolicyExclusions Out of Warranty Service Page Xantrex Technology Inc