Xantrex Technology GT100E owner manual Installation

Page 17

2 Installation

Chapter 2 contains procedures on how to mount the

GT100E MS and make the cable connections.

Image 17
Contents GT100E MS Combiner Box for Master/Slave Configuration Page GT100E MS Combiner Box for Master/Slave Configuration Date and Revision Organization Purpose ScopeAudience Related Information Conventions UsedImportant Safety Instructions Page Contents Viii Figures Page Introduction GT100E MS Combiner Box Master/Slave ConfigurationDifference between Configured Master/Slave and Operational Master Unit Master/Slave Operation StatesFault Condition Mis-configuration of UnitsInstallation To unpack the GT100E MS from the shipping pallet Equipment RequiredUnpacking the GT100E MS 1GT100E MS Componenets To mount the MS100E combiner box onto a wall Mounting InstructionsWire Gauge and Torque Specifications Cable InstallationMS100E Connections PV Array and GT100E Connections 5PV Array #1 and GT100E #1 Connections To make PV Array #1 and GT100E #1 connections6PV Array #2 and GT100E #2 Connections To make PV Array #2 and GT100E #2 connectionsTo make GT100E MS Control Power Cable connections GT100E MS Control Power Cable8Location of GT100E MS in the GT100E 9GT100E MS Interface Assembly Installation To install the GT100E MS Interface AssemblyTo install the MS100E Control Power and Interface Cable To install the MS100E Interface Assembly CableTo install the MS100E Interface Assembly for GT100E #2 GT100E Unit InstallationConfiguration To set a unit up as the Master Unit To set a unit up as the Slave Unit Configuration What does this warranty cover and how long does it last? Limited WarrantyHow do you get service? What will Xantrex do?Limitations on Exclusions What does this warranty not cover?Exclusions Exclusion for Documentation Out of Warranty ServiceWA-4 Page Xantrex Technology Inc