Xantrex Technology GT100E owner manual

Page 39
Image 39
Contents GT100E MS Combiner Box for Master/Slave Configuration Page GT100E MS Combiner Box for Master/Slave Configuration Date and Revision Purpose Scope AudienceOrganization Related Information Conventions UsedImportant Safety Instructions Page Contents Viii Figures Page Introduction Master/Slave Configuration Difference between Configured Master/Slave and OperationalGT100E MS Combiner Box Master Unit Master/Slave Operation StatesFault Condition Mis-configuration of UnitsInstallation Equipment Required Unpacking the GT100E MSTo unpack the GT100E MS from the shipping pallet 1GT100E MS Componenets To mount the MS100E combiner box onto a wall Mounting InstructionsWire Gauge and Torque Specifications Cable InstallationMS100E Connections PV Array and GT100E Connections 5PV Array #1 and GT100E #1 Connections To make PV Array #1 and GT100E #1 connections6PV Array #2 and GT100E #2 Connections To make PV Array #2 and GT100E #2 connectionsTo make GT100E MS Control Power Cable connections GT100E MS Control Power Cable8Location of GT100E MS in the GT100E 9GT100E MS Interface Assembly Installation To install the GT100E MS Interface AssemblyTo install the MS100E Control Power and Interface Cable To install the MS100E Interface Assembly CableTo install the MS100E Interface Assembly for GT100E #2 GT100E Unit InstallationConfiguration To set a unit up as the Master Unit To set a unit up as the Slave Unit Configuration What will Xantrex do? Limited WarrantyWhat does this warranty cover and how long does it last? How do you get service?What does this warranty not cover? ExclusionsLimitations on Exclusions Exclusion for Documentation Out of Warranty ServiceWA-4 Page Xantrex Technology Inc