Xantrex Technology GT100E owner manual

Page 2
Image 2
Contents GT100E MS Combiner Box for Master/Slave Configuration Page GT100E MS Combiner Box for Master/Slave Configuration Date and Revision Organization Purpose ScopeAudience Conventions Used Related InformationImportant Safety Instructions Page Contents Viii Figures Page Introduction GT100E MS Combiner Box Master/Slave ConfigurationDifference between Configured Master/Slave and Operational Master/Slave Operation States Master UnitMis-configuration of Units Fault ConditionInstallation To unpack the GT100E MS from the shipping pallet Equipment RequiredUnpacking the GT100E MS 1GT100E MS Componenets Mounting Instructions To mount the MS100E combiner box onto a wallCable Installation Wire Gauge and Torque SpecificationsMS100E Connections PV Array and GT100E Connections To make PV Array #1 and GT100E #1 connections 5PV Array #1 and GT100E #1 ConnectionsTo make PV Array #2 and GT100E #2 connections 6PV Array #2 and GT100E #2 ConnectionsGT100E MS Control Power Cable To make GT100E MS Control Power Cable connections8Location of GT100E MS in the GT100E To install the GT100E MS Interface Assembly 9GT100E MS Interface Assembly InstallationTo install the MS100E Interface Assembly Cable To install the MS100E Control Power and Interface CableGT100E Unit Installation To install the MS100E Interface Assembly for GT100E #2Configuration To set a unit up as the Master Unit To set a unit up as the Slave Unit Configuration How do you get service? Limited WarrantyWhat does this warranty cover and how long does it last? What will Xantrex do?Limitations on Exclusions What does this warranty not cover?Exclusions Out of Warranty Service Exclusion for DocumentationWA-4 Page Xantrex Technology Inc