Installation
To make PV Array #1 and GT100E #1 connections:
1.Route the PV Array #1 cables through the access panel and connect the cables to PV ARRAY #1 PV(+) and
2.Route the GT100E #1 cables through the access panel and connect the cables to GT100E #1 PV(+) UNIT and
3.Route the PV Array #1 ground cable through the access panel and connect the cable to PV ARRAY #1 GND terminal, see Figure
Combiner Box | Combiner Box | Combiner Box | Combiner Box | Combiner Box |
PV ARRAY #1 | PV ARRAY #1 | PV ARRAY #1 | GT100E #1 | GT100E #1 |
GND Terminal | PV (+) Terminal | PV | PV (+) Terminal | PV |
Figure 2-5 PV Array #1 and GT100E #1 Connections
152602 |