Cable Installation
To make PV Array #2 and GT100E #2 connections:
1.Route the GT100E #2 cables through the access panel and connect the cables to GT100E UNIT #2 PV(+) and
2.Route the PV Array #2 cables through the access panel and connect the cables to PV ARRAY #2 PV(+) and
3.Route the PV Array #2 ground cable through the access panel and connect the cable to PV ARRAY #2 GND terminal see Figure
Combiner Box | Combiner Box | Combiner Box | Combiner Box | Combiner Box |
PV ARRAY #2 | PV ARRAY #2 | GT100E #2 | GT100E #2 | PV ARRAY #2 |
PV (+) Terminal | PV | PV (+) Terminal | PV | GND Terminal |
Figure 2-6 PV Array #2 and GT100E #2 Connections