Xantrex Technology owner manual PV Array and GT100E Connections

Page 23

Cable Installation

PV Array and GT100E Connections

PV ARRAY #1

PV ARRAY #2

and GT100E #1

and GT100E #2

Connections

Connections

Figure 2-4PV Array and GT100E Connections

152602

2–7

Image 23
Contents GT100E MS Combiner Box for Master/Slave Configuration Page GT100E MS Combiner Box for Master/Slave Configuration Date and Revision Organization Purpose ScopeAudience Related Information Conventions UsedImportant Safety Instructions Page Contents Viii Figures Page Introduction GT100E MS Combiner Box Master/Slave ConfigurationDifference between Configured Master/Slave and Operational Master Unit Master/Slave Operation StatesFault Condition Mis-configuration of UnitsInstallation To unpack the GT100E MS from the shipping pallet Equipment RequiredUnpacking the GT100E MS 1GT100E MS Componenets To mount the MS100E combiner box onto a wall Mounting InstructionsWire Gauge and Torque Specifications Cable InstallationMS100E Connections PV Array and GT100E Connections 5PV Array #1 and GT100E #1 Connections To make PV Array #1 and GT100E #1 connections6PV Array #2 and GT100E #2 Connections To make PV Array #2 and GT100E #2 connectionsTo make GT100E MS Control Power Cable connections GT100E MS Control Power Cable8Location of GT100E MS in the GT100E 9GT100E MS Interface Assembly Installation To install the GT100E MS Interface AssemblyTo install the MS100E Control Power and Interface Cable To install the MS100E Interface Assembly CableTo install the MS100E Interface Assembly for GT100E #2 GT100E Unit InstallationConfiguration To set a unit up as the Master Unit To set a unit up as the Slave Unit Configuration What will Xantrex do? Limited WarrantyWhat does this warranty cover and how long does it last? How do you get service?Limitations on Exclusions What does this warranty not cover?Exclusions Exclusion for Documentation Out of Warranty ServiceWA-4 Page Xantrex Technology Inc