Xantrex Technology GT100E owner manual Master/Slave Operation States, Master Unit

Page 15

Master/Slave Operation States

If daily role reversal is on, then the configured slave is operational slave on odd days (January 1,3,5,...) and operational master on even days (January 2,4,6,...).

Master Unit

The GT100E Master inverter will control the GT100E MS Combiner Box via a control cable. The Master inverter will enable and disable the Slave inverter, and monitor the status of the Slave inverter through an interconnect cable. If the interconnect cable is disconnected, the master will open the combiner box and go online.

Slave Unit

The GT100E Slave inverter will monitor the status of the Master inverter through the interconnect cable. The inverter will be enabled from the Master inverter. If the interconnect cable is disconnected then the slave will go online.

Master/Slave Operation States

The Master/Slave operation states will follow the standard states specified by the GT100E Grid Tie Inverter Operation, Maintenance and Troubleshooting Manual (P/N 152365) with the following Master/Salve configuration state.

1.At Power up, the Master inverter will disable the Slave inverter, and close the contactor in the GT100E MS Combiner Box.

2.The Master inverter will go online through the normal operating States. The Slave inverter will remain disabled.

3.When the Master inverter's power level increases, and reaches the High Power Threshold (configurable parameter). The Master inverter will shutdown, open the contactor in the GT100E MSCombiner Box, and the Master will also enable the Slave inverter.

4.Both the Master and Slave Inverters will go to an online state.

5.End of the Day or Cloud Interaction - When the Master inverter's power level decreases, and reaches the Low Power Threshold and has maintained the power level for the Minimum Transition Seconds (configurable parameter). The Master and the Slave inverters will

152602

1–3

Image 15
Contents GT100E MS Combiner Box for Master/Slave Configuration Page GT100E MS Combiner Box for Master/Slave Configuration Date and Revision Purpose Scope AudienceOrganization Related Information Conventions UsedImportant Safety Instructions Page Contents Viii Figures Page Introduction Master/Slave Configuration Difference between Configured Master/Slave and OperationalGT100E MS Combiner Box Master Unit Master/Slave Operation StatesFault Condition Mis-configuration of UnitsInstallation Equipment Required Unpacking the GT100E MSTo unpack the GT100E MS from the shipping pallet 1GT100E MS Componenets To mount the MS100E combiner box onto a wall Mounting InstructionsWire Gauge and Torque Specifications Cable InstallationMS100E Connections PV Array and GT100E Connections 5PV Array #1 and GT100E #1 Connections To make PV Array #1 and GT100E #1 connections6PV Array #2 and GT100E #2 Connections To make PV Array #2 and GT100E #2 connectionsTo make GT100E MS Control Power Cable connections GT100E MS Control Power Cable8Location of GT100E MS in the GT100E 9GT100E MS Interface Assembly Installation To install the GT100E MS Interface AssemblyTo install the MS100E Control Power and Interface Cable To install the MS100E Interface Assembly CableTo install the MS100E Interface Assembly for GT100E #2 GT100E Unit InstallationConfiguration To set a unit up as the Master Unit To set a unit up as the Slave Unit Configuration What will Xantrex do? Limited WarrantyWhat does this warranty cover and how long does it last? How do you get service?What does this warranty not cover? ExclusionsLimitations on Exclusions Exclusion for Documentation Out of Warranty ServiceWA-4 Page Xantrex Technology Inc