1023583 Hose Kit
Install Hose Hanger
1.Remove lower bolt, washers, and nut that secures right fender to the ROPS.
2.Keep larger washer and discard the remaining hardware.
3.Attach hose hanger (9), using spacer (10), cap screw (12), flat washer (from tractor), lock washer (13), and nut (14) as shown in Figure 48 and Figure 49.
4.Route PRESSURE and PBY hoses through hanger as shown in Figure 49.
5.Secure hoses into position using lock pin (11).
6.Tighten all hydraulic fittings securely.
9.58280 Hose hanger
10.46948 Spacer
11.58047 Lock pin
12.31138 3/8 NC x
13.838 3/8 Lock washer
14.835 3/8 NC Hex nut
Figure 48. Hose Hanger Installation
12
11 | 9 |
DP5
Figure 49. Hose Hanger Installed
Connect Work Port Hoses
1.The control valve kit contains hoses assembled with quick couplers. Attach supply hoses to loader feedlines, following the color scheme shown in Figure 50.
2.Connect loader supply hoses to control valve hydraulic couplers when attaching loader.
Figure 50. LU126 & LU132 Control Valve and Loader Feedline Hose Connections
26 Hydraulic Installation | MAN0041 (Rev. 4/4/2008) |
|
|