Woods Equipment LU126 installation manual Hydraulic Installation, Hose Kit Assemble Loader Hoses

Models: LU126

1 38
Download 38 pages 40.37 Kb
Page 20
Image 20
1023577 Hose Kit

1023577 Hose Kit

Assemble Loader Hoses

1.Attach male half of quick coupler set (5) and elbow (2) to each of the loader feedline hoses (4). See Figure 34

2.Attach loader feedline hoses to the steel feedlines on the loader boom. See Figure 35.

3.Route hydraulic hoses along loader mount and under the right side of operator's platform to the tractor valve.

NOTE: Be sure to avoid contact with brake ped- als and other moveable tractor components. Hoses must be routed so that they are not

pinched, bent sharply, or chafed during operation.

Hoses must not interfere with any tractor controlFigure 34. Loader Hose Connection operation or contact any moving parts.

2.313015 Elbow, 3/8 NPTM x 3/8 NPTF 45°

4.1022986 Hose, 116" x 3/8 NPTM x 3/4 JICM

5.316007 Quick coupler set, male & female

Figure 35. Loader Feedline Connection

Connect Hoses to Tractor Valve

Connect hoses to the hydraulic quick couplers as shown in Figure 36.

BA

C

D

DP9

Figure 36. Hydraulic Hose Connection to

Tractor Valve

20 Hydraulic Installation

MAN0041 (Rev. 4/4/2008)

 

 

Page 20
Image 20
Woods Equipment LU126 Hydraulic Installation, Hose Kit Assemble Loader Hoses, Connect Hoses to Tractor Valve