46945 Hose Kit
Install Hose Hanger
1.Remove lower bolt, washers, and nut that secures right fender to the ROPS.
2.Keep larger washer and discard the remaining hardware.
3.Attach hose hanger (9), using spacer (10), cap screw (12), flat washer (from tractor), lock washer (13), and nut (14) as shown in Figure 20 and Figure 21.
4.Route PRESSURE and PBY hoses through hanger as shown in Figure 21.
5.Secure hoses into position using lock pin (11).
6.Route RETURN hose as shown in Figure 19 to avoid upper
7.Tighten all hydraulic fittings securely.
9.58280 Hose hanger
10.46948 Spacer
11.58047 Lock pin
12.31138 3/8 NC x
13.838 3/8 Lock washer
14.835 3/8 NC Hex nut
Figure 20. Hose Hanger Installation
12
11 | 9 |
DP5
Figure 21. Hose Hanger Installed
Connect Work Port Hoses
1.The control valve kit contains hoses assembled with quick couplers. Attach supply hoses to loader feedlines, following the color scheme shown in Figure 22.
2.Connect loader supply hoses to control valve hydraulic couplers when attaching loader.
Figure 22. 1020, 1027 Control Valve and Loader Feedline Hose Connections
14 Hydraulic Installation | MAN0041 (Rev. 4/4/2008) |
|
|