1010460 Hose Kit
Assemble Loader Hoses
1.Attach male half of quick coupler set (5) and elbow (2) to each of the loader feedline hoses (4). See Figure 27.
2.Attach loader feedline hoses to the steel feedlines on the loader boom. See Figure 28.
3.Route hydraulic hoses along loader mount and under the right side of operator's platform to the tractor valve.
NOTE: Be sure to avoid contact with brake ped- als and other moveable tractor components. Hoses must be routed so that they are not
pinched, bent sharply, or chafed during operation.
Hoses must not interfere with any tractor controlFigure 27. Loader Hose Connection operation or contact any moving parts.
2.313015 Elbow, 3/8 NPTM x 3/8 NPTF 45°
4.1009513 Hose, 76" x 3/8 NPTM x 3/4 JICM
5.316007 Quick coupler set, male & female
Figure 28. Loader Feedline Connection
Connect Hoses to Tractor Valve
Connect hoses to the hydraulic quick couplers as shown in Figure 29.
BA
C
D
DP9
Figure 29. Hydraulic Hose Connection to
Tractor Valve
MAN0041 (Rev. 4/4/2008) | Hydraulic Installation 17 |
|
|