Woods Equipment LU126 installation manual Hydraulic Installation, Hose Kit Assemble Loader Hoses

Models: LU126

1 38
Download 38 pages 40.37 Kb
Page 17
Image 17
1010460 Hose Kit

1010460 Hose Kit

Assemble Loader Hoses

1.Attach male half of quick coupler set (5) and elbow (2) to each of the loader feedline hoses (4). See Figure 27.

2.Attach loader feedline hoses to the steel feedlines on the loader boom. See Figure 28.

3.Route hydraulic hoses along loader mount and under the right side of operator's platform to the tractor valve.

NOTE: Be sure to avoid contact with brake ped- als and other moveable tractor components. Hoses must be routed so that they are not

pinched, bent sharply, or chafed during operation.

Hoses must not interfere with any tractor controlFigure 27. Loader Hose Connection operation or contact any moving parts.

2.313015 Elbow, 3/8 NPTM x 3/8 NPTF 45°

4.1009513 Hose, 76" x 3/8 NPTM x 3/4 JICM

5.316007 Quick coupler set, male & female

Figure 28. Loader Feedline Connection

Connect Hoses to Tractor Valve

Connect hoses to the hydraulic quick couplers as shown in Figure 29.

BA

C

D

DP9

Figure 29. Hydraulic Hose Connection to

Tractor Valve

MAN0041 (Rev. 4/4/2008)

Hydraulic Installation 17

 

 

Page 17
Image 17
Woods Equipment LU126 Hydraulic Installation, Hose Kit Assemble Loader Hoses, Connect Hoses to Tractor Valve