![](/images/new-backgrounds/1096097/9609745x1.webp)
1023584 Hose Kit
Install Hose Hanger
1.Remove a bolt from the bottom of right cab/operator’s platform support.
2.Attach hose hanger (4) and secure with tractor hardware previously removed.
3.Place hoses in hose hanger when routing hydraulic hoses to the tractor hydraulic couplers.
4.Secure hoses in position using lock pin (5).
4.59520 Hose hanger
5.58047 1/4 x
*Tractor hardware
Figure 41. Hose Hanger Installation
Verify Control Movements
1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and slowly drive tractor into loader. Shut off tractor.
2.Connect loader feedline hoses to tractor remote control couplers. See Figure 42.
3.Comply with all safety rules and start the tractor.
4.Mount loader to tractor by activating bucket cylinders to raise or lower the loader uprights into the loader mounts. Slowly advance tractor forward, activating appropriate cylinders to engage loader completely into mounts. Insert mounting pins to secure loader.
5.Check that all tractor hydraulic control lever positions operate the loader movements correctly.
6.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be correct before proceeding.
7.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic system and check oil level.
8.When hose routings and correct loader operations are verified, identify each circuit by placing a matching colored band around the male and female
9.Be sure that adequate slack is left in the hoses so they can move as the loader moves through its full range of motion.
10.Attach the plastic tie straps (included in kit) every
11.Before operating the loader, make sure that the
Figure 42. Loader Feedline to Tractor Remote Coupler Connections
MAN0041 (Rev. 4/4/2008) | Hydraulic Installation 23 |
|
|