Cisco Systems WS-F6K-PFC3BXL=, WS-F6K-PFC3B= manual Seating the PFC3B on the Supervisor Engine

Page 10

Installing the PFC3B

Figure 5 Seating the PFC3B on the Supervisor Engine

Apply pressure here

105309

Caution You must install all screws. The screws provide grounding between the PFC3B and the supervisor engine. Failure to install and tighten all screws will invalidate the safety approvals and can cause fire and electrical hazards.

Note Use the supplied screws and cap nuts to secure the PFC3B to the Supervisor Engine 720.

Step 5 Use a Phillips-head screwdriver to install the supplied screws and cap nuts that secure the PFC3B to the Supervisor Engine 720. (See Figure 6.)

Catalyst 6500 Series PFC3B and PFC3BXL Installation Note

10

78-16220-02

 

 

Image 10
Contents Catalyst 6500 Series PFC3B and PFC3BXL Installation Note Contents Safety OverviewParts List Required ToolsInstallation Guidelines Preparing the Supervisor Engine Removing the PFC3A from the Supervisor EngineRemoving Securing Screws and Cap Nuts Installing the PFC3B Removing the PFC3AInserting the PFC3B Under the EMI Gasket Male Standoff Location on the Supervisor Engine Seating the PFC3B on the Supervisor Engine Installing the Supplied Screws Applying the Label to the Supervisor Engine Console show moduleRelated Documentation TroubleshootingObtaining Documentation Documentation Feedback Obtaining Technical AssistanceCisco Technical Support Website Obtaining Additional Publications and Information 78-16220-02 Obtaining Additional Publications and Information