Cisco Systems WS-F6K-PFC3BXL=, WS-F6K-PFC3B= manual Inserting the PFC3B Under the EMI Gasket

Page 8

Installing the PFC3B

Figure 3 Inserting the PFC3B Under the EMI Gasket

105885

Caution Use care not to damage the connectors on the supervisor engine. If you damage a connector, you will have to return the supervisor engine to Cisco for repair.

Step 3 Align the PFC3B with the male standoffs on the Supervisor Engine 720, and carefully seat the PFC3B onto the Supervisor Engine 720. (See Figure 4.)

Catalyst 6500 Series PFC3B and PFC3BXL Installation Note

8

78-16220-02

 

 

Image 8
Contents Catalyst 6500 Series PFC3B and PFC3BXL Installation Note Contents Safety OverviewParts List Required ToolsInstallation Guidelines Preparing the Supervisor Engine Removing the PFC3A from the Supervisor EngineRemoving Securing Screws and Cap Nuts Installing the PFC3B Removing the PFC3AInserting the PFC3B Under the EMI Gasket Male Standoff Location on the Supervisor Engine Seating the PFC3B on the Supervisor Engine Installing the Supplied Screws Applying the Label to the Supervisor Engine Console show moduleObtaining Documentation TroubleshootingRelated Documentation Documentation Feedback Obtaining Technical AssistanceCisco Technical Support Website Obtaining Additional Publications and Information 78-16220-02 Obtaining Additional Publications and Information