Cisco Systems WS-F6K-PFC3B= manual Troubleshooting, Related Documentation, Obtaining Documentation

Page 13

Troubleshooting

Troubleshooting

Table 1 describes the basic troubleshooting information.

Table 1

Troubleshooting

 

 

 

 

Problem

 

Solution

 

 

The supervisor engine fails online diagnostics.

Remove the supervisor engine from the chassis

 

 

and make sure that all securing screws and cap

The supervisor engine experiences a

nuts are tight. See Figure 6 for screw locations.

software-forced reset or boots to ROMMON.

 

 

 

The supervisor engine does not boot up (no power

Remove the supervisor engine from the chassis

to supervisor engine, no console prompt, no

and reseat the SP and RP memory modules.

STATUS LED).

 

 

 

 

If these solutions do not resolve the issue, see the “Obtaining Technical Assistance” section on page 14 for information on obtaining technical assistance.

Related Documentation

For additional information on Catalyst 6500 series switches and command-line interface (CLI) commands, refer to the following publications:

Regulatory Compliance and Safety Information for the Catalyst 6500 Series Switches

Catalyst 6500 Series Switch Installation Guide

Catalyst 6500 Series Switch Module Installation Guide

Catalyst 6500 Series Switch Software Configuration Guide

Catalyst 6500 Series Switch Command Reference

Catalyst 6500 Series Switch Cisco IOS Software Configuration Guide

Catalyst 6500 Series Switch Cisco IOS Command Reference

Catalyst 6500 Series System Message Guide

Obtaining Documentation

Cisco documentation and additional literature are available on Cisco.com. Cisco also provides several ways to obtain technical assistance and other technical resources. These sections explain how to obtain technical information from Cisco Systems.

Catalyst 6500 Series PFC3B and PFC3BXL Installation Note

 

78-16220-02

13

 

 

 

Image 13
Contents Catalyst 6500 Series PFC3B and PFC3BXL Installation Note Safety Overview ContentsRequired Tools Parts ListInstallation Guidelines Removing the PFC3A from the Supervisor Engine Preparing the Supervisor EngineRemoving Securing Screws and Cap Nuts Removing the PFC3A Installing the PFC3BInserting the PFC3B Under the EMI Gasket Male Standoff Location on the Supervisor Engine Seating the PFC3B on the Supervisor Engine Installing the Supplied Screws Console show module Applying the Label to the Supervisor EngineRelated Documentation TroubleshootingObtaining Documentation Obtaining Technical Assistance Documentation FeedbackCisco Technical Support Website Obtaining Additional Publications and Information 78-16220-02 Obtaining Additional Publications and Information