Cisco Systems WS-F6K-PFC3B=, WS-F6K-PFC3BXL= manual Parts List, Required Tools

Page 3

Parts List

Warning Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, faceplates, front covers, and rear covers are in place. Statement 1029

Warning This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key, or other means of security. Statement 1017

Parts List

These parts are in the WS-F6K-PFC3B= or WS-F6K-PFC3BXL= kit:

One Catalyst 6500 series PFC3B or PFC3BXL

One packet of labels

One disposable grounding wrist strap

One bag of mounting screws

Two 1-GB DRAM DIMMs (to be installed on the Supervisor Engine 720 switch processor and route processor) — PFC3BXL only

Required Tools

Note In this section, the term "PFC3B" refers to the PFC3B and PFC3BXL unless otherwise noted.

These tools are required to perform the installation of the PFC3B:

Antistatic mat or foam pad to support the removed Supervisor Engine 720

3/16-inch flat-blade screwdriver for the captive installation screws on the Supervisor Engine 720

Number 1 Phillips screwdriver for the screws and cap nut that fasten the PFC3B to the Supervisor Engine 720

Your own ESD-prevention equipment or the disposable grounding wrist strap included with all upgrade kits, field-replaceable units (FRUs), and spares

Catalyst 6500 Series PFC3B and PFC3BXL Installation Note

 

78-16220-02

3

 

 

 

Image 3
Contents Catalyst 6500 Series PFC3B and PFC3BXL Installation Note Safety Overview ContentsRequired Tools Parts ListInstallation Guidelines Removing the PFC3A from the Supervisor Engine Preparing the Supervisor EngineRemoving Securing Screws and Cap Nuts Removing the PFC3A Installing the PFC3BInserting the PFC3B Under the EMI Gasket Male Standoff Location on the Supervisor Engine Seating the PFC3B on the Supervisor Engine Installing the Supplied Screws Console show module Applying the Label to the Supervisor EngineTroubleshooting Related DocumentationObtaining Documentation Obtaining Technical Assistance Documentation FeedbackCisco Technical Support Website Obtaining Additional Publications and Information 78-16220-02 Obtaining Additional Publications and Information