Cisco Systems WS-F6K-PFC3BXL=, WS-F6K-PFC3B= manual Removing Securing Screws and Cap Nuts

Page 6

Removing the PFC3A from the Supervisor Engine 720

Figure 1 Removing Securing Screws and Cap Nuts

105311

Caution Use care not to damage the connectors on the supervisor engine. If you damage a connector, you will have to return the supervisor engine to Cisco for repair.

Step 2 Hold the right edge of the PFC3A with your right hand and the rear left corner with your left hand. (See Figure 2.) Gently lift the PFC3A with both hands simultaneously and remove the PFC3A from the Supervisor Engine 720.

Catalyst 6500 Series PFC3B and PFC3BXL Installation Note

6

78-16220-02

 

 

Image 6
Contents Catalyst 6500 Series PFC3B and PFC3BXL Installation Note Contents Safety OverviewParts List Required ToolsInstallation Guidelines Preparing the Supervisor Engine Removing the PFC3A from the Supervisor EngineRemoving Securing Screws and Cap Nuts Installing the PFC3B Removing the PFC3AInserting the PFC3B Under the EMI Gasket Male Standoff Location on the Supervisor Engine Seating the PFC3B on the Supervisor Engine Installing the Supplied Screws Applying the Label to the Supervisor Engine Console show moduleTroubleshooting Related DocumentationObtaining Documentation Documentation Feedback Obtaining Technical AssistanceCisco Technical Support Website Obtaining Additional Publications and Information 78-16220-02 Obtaining Additional Publications and Information