Cisco Systems WS-F6K-PFC3B=, WS-F6K-PFC3BXL= manual Installing the PFC3B, Removing the PFC3A

Page 7

Installing the PFC3B

Figure 2 Removing the PFC3A

105736

Step 3 Place the PFC3A on an antistatic mat or antistatic foam pad.

Installing the PFC3B

Note In this section, the term "PFC3B" refers to the PFC3B and PFC3BXL unless otherwise noted.

To install the PFC3B on the Supervisor Engine 720, follow these steps:

Step 1 Remove the PFC3B from its antistatic bag.

Step 2 Insert the front edge of the PFC3B under the EMI gasket on the Supervisor Engine 720. (See Figure 3.)

Catalyst 6500 Series PFC3B and PFC3BXL Installation Note

 

78-16220-02

7

 

 

 

Image 7
Contents Catalyst 6500 Series PFC3B and PFC3BXL Installation Note Safety Overview ContentsRequired Tools Parts ListInstallation Guidelines Removing the PFC3A from the Supervisor Engine Preparing the Supervisor EngineRemoving Securing Screws and Cap Nuts Removing the PFC3A Installing the PFC3BInserting the PFC3B Under the EMI Gasket Male Standoff Location on the Supervisor Engine Seating the PFC3B on the Supervisor Engine Installing the Supplied Screws Console show module Applying the Label to the Supervisor EngineRelated Documentation TroubleshootingObtaining Documentation Obtaining Technical Assistance Documentation FeedbackCisco Technical Support Website Obtaining Additional Publications and Information 78-16220-02 Obtaining Additional Publications and Information