Appendix D Site Planning and Maintenance Records
Site Preparation Checklist
Table |
| Site Planning Checklist |
|
|
|
|
|
|
|
| |
Task No. | Planning Activity | Verified By | Time | Date | |
|
|
|
|
| |
1 | Space evaluation: |
|
|
| |
| • | Space and layout |
|
|
|
| • | Floor covering |
|
|
|
| • | Impact and vibration |
|
|
|
| • | Lighting |
|
|
|
| • | Maintenance access |
|
|
|
|
|
|
|
| |
2 | Environmental evaluation: |
|
|
| |
| • | Ambient temperature |
|
|
|
| • | Humidity |
|
|
|
| • | Altitude |
|
|
|
| • | Atmospheric contamination |
|
|
|
| • | Air flow |
|
|
|
|
|
|
|
| |
3 | Power evaluation: |
|
|
| |
| • | Input power type |
|
|
|
| • | Power receptacles1 |
|
|
|
| • Receptacle proximity to the equipment |
|
|
| |
| • Dedicated circuit for power supply |
|
|
| |
| • Dedicated (separate) circuits for redundant |
|
|
| |
|
| power supplies |
|
|
|
| • UPS2 for power failures |
|
|
| |
4 | Grounding evaluation: |
|
|
| |
| • | Circuit breaker size |
|
|
|
| • CO ground (AC- powered systems) |
|
|
| |
|
|
|
|
| |
5 | Cable and interface equipment evaluation: |
|
|
| |
| • | Cable type |
|
|
|
| • | Connector type |
|
|
|
| • | Cable distance limitations |
|
|
|
| • | Interface equipment (transceivers) |
|
|
|
|
|
|
|
| |
6 | Electromagnetic interference (EMI) evaluation: |
|
|
| |
| • Distance limitations for signaling |
|
|
| |
| • | Site wiring |
|
|
|
| • | RFI3 levels |
|
|
|
1.Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2.UPS = uninterruptible power supply.
3.RFI = radio frequency interference.
Cisco MDS 9100 Series Hardware Installation Guide
|
| ||
|
|