Cisco Systems ME 4924-10GE manual Network Configurations

Page 29

Chapter 1 Product Overview

Management Options

CiscoView application

The CiscoView device-management application displays the switch image that you can use to set configuration parameters and to view switch status and performance information. The CiscoView application, which you purchase separately, can be a standalone application or part of a Simple Network Management Protocol (SNMP) platform. Refer to the CiscoView documentation for more information.

SNMP network management

You can manage switches from a SNMP-compatible management station that is running platforms such as HP OpenView or SunNet Manager. The switch supports a comprehensive set of Management Information Base (MIB) extensions and four Remote Monitoring (RMON) groups. Refer to the switch software configuration guide on Cisco.com and the documentation that came with your SNMP application for more information.

Cisco Intelligence Engine 2100 (IE2100)

Cisco IE200 Series Configuration Registrar is a network management device that works with embedded CNS agents in the switch software. You can automate initial configurations and configuration updates by generating switch-specific configuration changes, sending them to the switch, executing the configuration change, and logging the results.

Network Configurations

Refer to the switch software configuration guide on Cisco.com for network configuration concepts and examples of using the switch to create dedicated network segments and interconnecting the segments through Gigabit Ethernet connections.

Cisco ME 4924-10GE Ethernet Switch Hardware Installation Guide

 

OL-10071-01

1-9

 

 

 

Image 29
Contents Text Part Number OL-10071-01 Corporate HeadquartersPage Iii N T E N T SPower Management for the Cisco ME 4924-10GE Switch Understanding Post Results OL-10071-01 Audience PrefacePurpose OrganizationViii ConventionsStatement 1071-Warning Definition Säilytä Nämä Ohjeet Guarde Estas Instruções GEM Disse Anvisninger Xii Xiii Obtaining Documentation Related PublicationsCisco.com XivProduct Documentation DVD Ordering Documentation Documentation FeedbackCisco Product Security Overview Xvi Reporting Security Problems in Cisco ProductsProduct Alerts and Field Notices Xvii Obtaining Technical AssistanceCisco Technical Support & Documentation Website Definitions of Service Request Severity Submitting a Service RequestObtaining Additional Publications and Information XviiiXix OL-10071-01 Product Overview FeaturesHardware Features Software Features Optical Support Front Panel DescriptionConsole Port LEDs Management PortSFP Module Ports FAN LED Status LED Color or State Description LEDRear Panel Description Power SuppliesPower Management for the Cisco ME 4924-10GE Switch Environmental Monitoring of the Power SuppliesPower Management Modes Management OptionsNetwork Configurations OL-10071-01 Preparing for Installation Switch InstallationStatement Installation Guidelines Verifying Package Contents Connecting a PC or Terminal to the Console Port Verifying Switch OperationConnecting to the Console Port Powering On the Switch and Running PostAttaching Brackets to the Switch Rack-Mounting the SwitchPowering Off the Switch and Disconnecting the Console Port Attaching the Cable Guide Installing and Removing SFP ModulesMounting the Switch in a Rack 4shows an SFP module that has a bale-clasp latch Installing SFP Modules into SFP Module PortsRemoving SFP Modules from SFP Module Ports Installing an SFP Module into an SFP Module PortConnecting to a Fiber-Optic SFP Module Connecting to an SFP ModuleConnecting to a Fiber-Optic SFP Module Port X2 Module Handling Guidelines and Installation Connecting to 1000BASE-T SFP Modules10-Gigabit Ethernet X2 Module Specification Description10 Installing the 10-Gigabit Ethernet X2 Module Installing the 10-Gigabit Ethernet X2 ModuleOL-10071-01 Removing the 10-Gigabit Ethernet X2 Module Module Maintenance GuidelinesCleaning the Fiber-Optic Connectors Where to Go Next Grounding Requirements Connecting the Power SupplyConnecting AC Power to the Cisco ME 4924-10GE Switch Connecting DC Power to the Cisco ME 4924-10GE Switch DC Power Supply Understanding Post Results TroubleshootingSymptom Possible Cause Resolution Diagnosing ProblemsGbic-invalid global Troubleshooting the Hardware ComponentsGetting Started Problem Solving to the System Component LevelIdentifying Startup Problems LED and Color Meaning LED ReadingsTroubleshooting the Power Supply Contacting Customer ServiceAC Power Technical SpecificationsSafety DC PowerConnecting to 1000BASE-T Devices Connector and Cable SpecificationsConnector Specifications Figure B-2 Identifying a Crossover CableSwitch Console RJ-45-to-DB-9 Port DTE Cable and Adapter SpecificationsSwitch Console RJ-45-to-DB-25 Port DTE Adapter PinoutsConsole Port Pin Signal Direction DescriptionConnecting to the Switch Initial Configuration for the SwitchStarting the Terminal-Emulation Software Figure C-1 Connecting a Switch to a PCConnecting to a Power Source Performing the Initial Configuration Entering the Initial Configuration InformationIP Settings Configure an enable password, and press Return Save the running configuration IN-1 NumericsIN-2 IN-3 PostIN-4 Startup
Related manuals
Manual 60 pages 573 b