Cisco Systems ME 4924-10GE manual Save the running configuration

Page 70

Appendix C Initial Configuration for the Switch

Entering the Initial Configuration Information

FastEthernet1

unassigned

YES

unset

up

up

!--- Output

suppressed.

 

 

 

 

 

Switch1#

show ip

route

 

 

 

 

 

Codes: C

- connected, S - static, I - IGRP,

R - RIP, M - mobile,

B - BGP

D

- EIGRP, EX - EIGRP external,

O - OSPF, IA - OSPF inter

area

N1

-

OSPF

NSSA external type 1,

N2 -

OSPF NSSA external type 2

E1

-

OSPF

external type 1, E2 -

OSPF

external type 2, E -

EGP

i- IS-IS, L1 - ISIS level-1, L2 - ISIS level-2, ia - ISIS inter area * - candidate default, U - per-user static route, o - ODR

P - periodic downloaded static route

Gateway of last resort is 172.16.1.1 to network 0.0.0.0

 

172.16.0.0/24

is subnetted, 1 subnets

C

172.16.1.0

is directly connected, Vlan1

S*

0.0.0.0/0 [1/0] via 172.16.1.1

Switch1#

Step 15 Save the running configuration:

Switch1# copy system:running-config nvram:startup-config

You have now completed the initial configuration of the switch.

To use the CLI to perform additional configuration or management tasks, enter commands at the Switch> prompt through the console port by using a terminal program or through the network by using Telnet. For configuration information, refer to the switch software configuration guide or the switch command reference.

Cisco ME 4924-10GE Ethernet Switch Hardware Installation Guide

 

C-6

OL-10071-01

 

 

 

Image 70
Contents Corporate Headquarters Text Part Number OL-10071-01Page N T E N T S IiiPower Management for the Cisco ME 4924-10GE Switch Understanding Post Results OL-10071-01 Purpose PrefaceAudience OrganizationStatement 1071-Warning Definition ConventionsViii Säilytä Nämä Ohjeet Guarde Estas Instruções GEM Disse Anvisninger Xii Xiii Cisco.com Related PublicationsObtaining Documentation XivCisco Product Security Overview Documentation FeedbackProduct Documentation DVD Ordering Documentation Product Alerts and Field Notices Reporting Security Problems in Cisco ProductsXvi Cisco Technical Support & Documentation Website Obtaining Technical AssistanceXvii Obtaining Additional Publications and Information Submitting a Service RequestDefinitions of Service Request Severity XviiiXix OL-10071-01 Hardware Features FeaturesProduct Overview Software Features Console Port Front Panel DescriptionOptical Support SFP Module Ports Management PortLEDs FAN LED Status LED LED Color or State DescriptionPower Supplies Rear Panel DescriptionPower Management Modes Environmental Monitoring of the Power SuppliesPower Management for the Cisco ME 4924-10GE Switch Management OptionsNetwork Configurations OL-10071-01 Switch Installation Preparing for InstallationStatement Installation Guidelines Verifying Package Contents Verifying Switch Operation Connecting a PC or Terminal to the Console PortPowering On the Switch and Running Post Connecting to the Console PortPowering Off the Switch and Disconnecting the Console Port Rack-Mounting the SwitchAttaching Brackets to the Switch Mounting the Switch in a Rack Installing and Removing SFP ModulesAttaching the Cable Guide Installing SFP Modules into SFP Module Ports 4shows an SFP module that has a bale-clasp latchInstalling an SFP Module into an SFP Module Port Removing SFP Modules from SFP Module PortsConnecting to an SFP Module Connecting to a Fiber-Optic SFP ModuleConnecting to a Fiber-Optic SFP Module Port Connecting to 1000BASE-T SFP Modules X2 Module Handling Guidelines and InstallationSpecification Description 10-Gigabit Ethernet X2 ModuleInstalling the 10-Gigabit Ethernet X2 Module 10 Installing the 10-Gigabit Ethernet X2 ModuleOL-10071-01 Module Maintenance Guidelines Removing the 10-Gigabit Ethernet X2 ModuleCleaning the Fiber-Optic Connectors Where to Go Next Connecting the Power Supply Grounding RequirementsConnecting AC Power to the Cisco ME 4924-10GE Switch Connecting DC Power to the Cisco ME 4924-10GE Switch DC Power Supply Troubleshooting Understanding Post ResultsDiagnosing Problems Symptom Possible Cause ResolutionTroubleshooting the Hardware Components Gbic-invalid globalIdentifying Startup Problems Problem Solving to the System Component LevelGetting Started LED Readings LED and Color MeaningContacting Customer Service Troubleshooting the Power SupplyTechnical Specifications AC PowerDC Power SafetyConnector Specifications Connector and Cable SpecificationsConnecting to 1000BASE-T Devices Identifying a Crossover Cable Figure B-2Switch Console RJ-45-to-DB-25 Port DTE Cable and Adapter SpecificationsSwitch Console RJ-45-to-DB-9 Port DTE Adapter PinoutsPin Signal Direction Description Console PortInitial Configuration for the Switch Connecting to the SwitchFigure C-1 Connecting a Switch to a PC Starting the Terminal-Emulation SoftwareConnecting to a Power Source IP Settings Entering the Initial Configuration InformationPerforming the Initial Configuration Configure an enable password, and press Return Save the running configuration Numerics IN-1IN-2 Post IN-3Startup IN-4
Related manuals
Manual 60 pages 573 b