Cisco Systems ME 4924-10GE manual Switch Installation, Preparing for Installation

Page 31

C H A P T E R 2

Switch Installation

This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that ensures proper operation. It describes how to install the switch and make connections to the switch. Read the topics and perform the procedures in this order:

Preparing for Installation, page 2-1

Verifying Switch Operation, page 2-4

Rack-Mounting the Switch, page 2-6

Installing and Removing SFP Modules, page 2-7

Connecting to an SFP Module, page 2-10

Where to Go Next, page 2-18

Preparing for Installation

This section covers these topics:

Warnings, page 2-1

Installation Guidelines, page 2-3

Verifying Package Contents, page 2-3

Verifying Switch Operation, page 2-4

Warnings

These warnings are translated into several languages in the Regulatory Compliance and Safety Information Guide for the Cisco ME 4924-10GE Switch, which ships with the switch.

Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43

Warning Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury and equipment damage. Statement 48

Cisco ME 4924-10GE Ethernet Switch Hardware Installation Guide

 

OL-10071-01

2-1

 

 

 

Image 31
Contents Text Part Number OL-10071-01 Corporate HeadquartersPage Iii N T E N T SPower Management for the Cisco ME 4924-10GE Switch Understanding Post Results OL-10071-01 Organization PrefaceAudience PurposeStatement 1071-Warning Definition ConventionsViii Säilytä Nämä Ohjeet Guarde Estas Instruções GEM Disse Anvisninger Xii Xiii Xiv Related PublicationsObtaining Documentation Cisco.comCisco Product Security Overview Documentation FeedbackProduct Documentation DVD Ordering Documentation Product Alerts and Field Notices Reporting Security Problems in Cisco ProductsXvi Cisco Technical Support & Documentation Website Obtaining Technical AssistanceXvii Xviii Submitting a Service RequestDefinitions of Service Request Severity Obtaining Additional Publications and InformationXix OL-10071-01 Hardware Features FeaturesProduct Overview Software Features Console Port Front Panel DescriptionOptical Support SFP Module Ports Management PortLEDs FAN LED Status LED Color or State Description LEDRear Panel Description Power SuppliesManagement Options Environmental Monitoring of the Power SuppliesPower Management for the Cisco ME 4924-10GE Switch Power Management ModesNetwork Configurations OL-10071-01 Preparing for Installation Switch InstallationStatement Installation Guidelines Verifying Package Contents Connecting a PC or Terminal to the Console Port Verifying Switch OperationConnecting to the Console Port Powering On the Switch and Running PostPowering Off the Switch and Disconnecting the Console Port Rack-Mounting the SwitchAttaching Brackets to the Switch Mounting the Switch in a Rack Installing and Removing SFP ModulesAttaching the Cable Guide 4shows an SFP module that has a bale-clasp latch Installing SFP Modules into SFP Module PortsRemoving SFP Modules from SFP Module Ports Installing an SFP Module into an SFP Module PortConnecting to a Fiber-Optic SFP Module Connecting to an SFP ModuleConnecting to a Fiber-Optic SFP Module Port X2 Module Handling Guidelines and Installation Connecting to 1000BASE-T SFP Modules10-Gigabit Ethernet X2 Module Specification Description10 Installing the 10-Gigabit Ethernet X2 Module Installing the 10-Gigabit Ethernet X2 ModuleOL-10071-01 Removing the 10-Gigabit Ethernet X2 Module Module Maintenance GuidelinesCleaning the Fiber-Optic Connectors Where to Go Next Grounding Requirements Connecting the Power SupplyConnecting AC Power to the Cisco ME 4924-10GE Switch Connecting DC Power to the Cisco ME 4924-10GE Switch DC Power Supply Understanding Post Results TroubleshootingSymptom Possible Cause Resolution Diagnosing ProblemsGbic-invalid global Troubleshooting the Hardware ComponentsIdentifying Startup Problems Problem Solving to the System Component LevelGetting Started LED and Color Meaning LED ReadingsTroubleshooting the Power Supply Contacting Customer ServiceAC Power Technical SpecificationsSafety DC PowerConnector Specifications Connector and Cable SpecificationsConnecting to 1000BASE-T Devices Figure B-2 Identifying a Crossover CableAdapter Pinouts Cable and Adapter SpecificationsSwitch Console RJ-45-to-DB-9 Port DTE Switch Console RJ-45-to-DB-25 Port DTEConsole Port Pin Signal Direction DescriptionConnecting to the Switch Initial Configuration for the SwitchStarting the Terminal-Emulation Software Figure C-1 Connecting a Switch to a PCConnecting to a Power Source IP Settings Entering the Initial Configuration InformationPerforming the Initial Configuration Configure an enable password, and press Return Save the running configuration IN-1 NumericsIN-2 IN-3 PostIN-4 Startup
Related manuals
Manual 60 pages 573 b