C H A P T E R 2
Switch Installation
This chapter describes how to start your switch and how to interpret the
•Preparing for Installation, page
•Verifying Switch Operation, page
•
•Installing and Removing SFP Modules, page
•Connecting to an SFP Module, page
•Where to Go Next, page
Preparing for Installation
This section covers these topics:
•Warnings, page
•Installation Guidelines, page
•Verifying Package Contents, page
•Verifying Switch Operation, page
Warnings
These warnings are translated into several languages in the Regulatory Compliance and Safety Information Guide for the Cisco ME
Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43
Warning Do not stack the chassis on any other equipment. If the chassis falls, it can cause severe bodily injury and equipment damage. Statement 48
Cisco ME
|
| ||
|
|