Cisco Systems ME 4924-10GE manual Installing the 10-Gigabit Ethernet X2 Module

Page 44

Chapter 2 Switch Installation

Installing the 10-Gigabit Ethernet X2 Module

Warning Use of controls, adjustments, or performing procedures other than those specified may result in hazardous radiation exposure. Statement 1057

If a module designed for operation on an SMF cable is directly coupled to an MMF cable, an effect known as Differential Mode Delay (DMD) might occur. See the Catalyst 4500 Series Module Installation Guide for more information.

Installing the 10-Gigabit Ethernet X2 Module

Caution The 10-Gigabit Ethernet X2 module is a static-sensitive device. Always use an ESD wrist strap or similar individual grounding device when handling modules or coming into contact with modules.

To install a 10-Gigabit Ethernet X2 module, follow these steps:

Step 1 Using a small flat-blade screwdriver, carefully pry the module port cover off of the module faceplate.

Use the two arrows on the port cover as guides for inserting the screwdriver blade. Save the port cover for future use.

Step 2 Remove the module from its protective packaging.

Step 3 Check the label on the module to verify that it is the correct model for your network. Step 4 Insert the module with the cooling fins up. (See Figure 2-10.)

Figure 2-10 Installing the 10-Gigabit Ethernet X2 Module

 

 

154917

 

 

 

 

Cisco ME 4924-10GE Ethernet Switch Hardware Installation Guide

 

 

 

 

 

 

 

 

 

2-14

 

OL-10071-01

 

 

 

 

Image 44
Contents Corporate Headquarters Text Part Number OL-10071-01Page N T E N T S IiiPower Management for the Cisco ME 4924-10GE Switch Understanding Post Results OL-10071-01 Preface AudiencePurpose OrganizationViii ConventionsStatement 1071-Warning Definition Säilytä Nämä Ohjeet Guarde Estas Instruções GEM Disse Anvisninger Xii Xiii Related Publications Obtaining DocumentationCisco.com XivProduct Documentation DVD Ordering Documentation Documentation FeedbackCisco Product Security Overview Xvi Reporting Security Problems in Cisco ProductsProduct Alerts and Field Notices Xvii Obtaining Technical AssistanceCisco Technical Support & Documentation Website Submitting a Service Request Definitions of Service Request SeverityObtaining Additional Publications and Information XviiiXix OL-10071-01 Product Overview FeaturesHardware Features Software Features Optical Support Front Panel DescriptionConsole Port LEDs Management PortSFP Module Ports FAN LED Status LED LED Color or State DescriptionPower Supplies Rear Panel DescriptionEnvironmental Monitoring of the Power Supplies Power Management for the Cisco ME 4924-10GE SwitchPower Management Modes Management OptionsNetwork Configurations OL-10071-01 Switch Installation Preparing for InstallationStatement Installation Guidelines Verifying Package Contents Verifying Switch Operation Connecting a PC or Terminal to the Console PortPowering On the Switch and Running Post Connecting to the Console PortAttaching Brackets to the Switch Rack-Mounting the SwitchPowering Off the Switch and Disconnecting the Console Port Attaching the Cable Guide Installing and Removing SFP ModulesMounting the Switch in a Rack Installing SFP Modules into SFP Module Ports 4shows an SFP module that has a bale-clasp latchInstalling an SFP Module into an SFP Module Port Removing SFP Modules from SFP Module PortsConnecting to an SFP Module Connecting to a Fiber-Optic SFP ModuleConnecting to a Fiber-Optic SFP Module Port Connecting to 1000BASE-T SFP Modules X2 Module Handling Guidelines and InstallationSpecification Description 10-Gigabit Ethernet X2 ModuleInstalling the 10-Gigabit Ethernet X2 Module 10 Installing the 10-Gigabit Ethernet X2 ModuleOL-10071-01 Module Maintenance Guidelines Removing the 10-Gigabit Ethernet X2 ModuleCleaning the Fiber-Optic Connectors Where to Go Next Connecting the Power Supply Grounding RequirementsConnecting AC Power to the Cisco ME 4924-10GE Switch Connecting DC Power to the Cisco ME 4924-10GE Switch DC Power Supply Troubleshooting Understanding Post ResultsDiagnosing Problems Symptom Possible Cause ResolutionTroubleshooting the Hardware Components Gbic-invalid globalGetting Started Problem Solving to the System Component LevelIdentifying Startup Problems LED Readings LED and Color MeaningContacting Customer Service Troubleshooting the Power SupplyTechnical Specifications AC PowerDC Power SafetyConnecting to 1000BASE-T Devices Connector and Cable SpecificationsConnector Specifications Identifying a Crossover Cable Figure B-2Cable and Adapter Specifications Switch Console RJ-45-to-DB-9 Port DTESwitch Console RJ-45-to-DB-25 Port DTE Adapter PinoutsPin Signal Direction Description Console PortInitial Configuration for the Switch Connecting to the SwitchFigure C-1 Connecting a Switch to a PC Starting the Terminal-Emulation SoftwareConnecting to a Power Source Performing the Initial Configuration Entering the Initial Configuration InformationIP Settings Configure an enable password, and press Return Save the running configuration Numerics IN-1IN-2 Post IN-3Startup IN-4
Related manuals
Manual 60 pages 573 b