Cisco Systems OSR-7609, 6509-NEB manual Replacing the Panel Safety Cover, AC-Input Systems

Page 5

Replacing the Panel Safety Cover

Warning This unit might have more than one power supply connection. All connections must be removed to de-energize the unit. Statement 1028

Step 2 Depending on how your system is powered, perform one of the two sets of substeps below.

AC-Input Systems

a.Turn the power switch to the Off (0) position on each power supply. Turning the power switch off also disengages a pawl that unlocks the power supply from the chassis.

b.Disconnect the power cord from the power source.

c.Loosen the screw on the cable retention device, and disconnect the power cord from the power supply being removed.

Note The AC power cord for the 4000 W power supply is hard wired and cannot be removed from the supply.

Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit.

Statement 1003

DC-Input Systems

a.Verify that power is off to the DC circuit for each power supply. As an added safety precaution, you should secure the source DC circuit breaker switch in the OFF position with electrical tape.

b.Turn the power switch to the Off (0) position on each power supply. Turning the power switch off also disengages a pawl that unlocks the power supply from the chassis.

Replacing the Panel Safety Cover

This section describes how to remove and install the panel safety cover for the Catalyst 6509-NEB switch and Cisco OSR-7609 Router. A number 1 Phillips-head screwdriver is required to perform this procedure.

Caution Always use an ESD wrist strap when handling modules or coming into contact with internal components.

Warning Hazardous voltage or energy is present on the backplane when the system is operating. Use caution when servicing. Statement 1034

To remove the panel safety cover, perform these steps:

Step 1 Use a number 1 Phillips-head screwdriver to remove the 8 panel screws, 4 each located along the top and bottom of the chassis. (See Figure 1.) Set the screws aside.

Step 2 Grasp the panel handle and pull the panel away from the chassis.

Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note

 

78-16162-02

5

 

 

 

Image 5
Contents Product Number WS-6509-NEB-UPGRD= Safety Overview ContentsRequired Tools Parts ListShutting Down the System Installation GuidelinesAC-Input Systems Replacing the Panel Safety CoverPanel handle Replacing the Fan Tray Installing the Panel Safety CoverRemoving the Fan Tray Removing the Fan TrayHigh Speed FAN Installing the High Speed Fan TrayRemoving an AC-Input Power Supply Replacing the Power SupplyRemoving an AC-Input Power Supply 3000 Watt AC-Input Power Supply Front Panel Installing the 3000 W AC-Input Power SupplyConnecting Power to the Fan Tray Connecting Power to the Fan TrayCable Connectors Installing the Fan Tray Power Cable for AC-Input SystemsTerminal block covers Connecting Site Power to the Fan Tray for DC-Input SystemsRemoving the Terminal Block Cover Removing the Supervisor Engine Replacing the Supervisor EngineInstalling the Supervisor Engine Positioning the Supervisor Engine in the Chassis Clearing the EMI Gasket in the Chassis AC-Input Systems Powering Up the SystemDC-Input Systems Verifying InstallationObtaining Documentation Related DocumentationCisco.com Product Documentation DVDOrdering Documentation Documentation FeedbackCisco Product Security Overview Obtaining Technical Assistance Reporting Security Problems in Cisco ProductsCisco Technical Support & Documentation Website Submitting a Service RequestObtaining Additional Publications and Information Definitions of Service Request SeverityObtaining Additional Publications and Information