Cisco Systems OSR-7609, 6509-NEB Replacing the Supervisor Engine, Removing the Supervisor Engine

Page 17

Replacing the Supervisor Engine

Figure 14 DC-Input Wire Connections on the Terminal Block

48V INPUT 1

+

GND

INPUT POWER

GOOD

RTN

-48vdc GND

 

 

105085

 

 

 

Warning

When installing or replacing the unit, the ground connection must always be made first and

 

 

disconnected last. Statement 1046

 

 

Step 5

After ensuring that all wire connections are secure, reinstall the terminal block cover.

 

 

 

Replacing the Supervisor Engine

Before you can power up the system, you need to remove the supervisor engine from slot 1 (if a redundant supervisor engine is present, remove it from slot 2) and install the Supervisor Engine 720 or the Supervisor Engine 32 in slot 5 or 6.

Removing the Supervisor Engine

This section describes how to remove an existing supervisor engine from a chassis slot.

To remove a supervisor engine from the chassis, perform these steps:

Step 1 Disconnect any network interface cables attached to the supervisor engine.

Step 2 Verify that the captive installation screws on all of the modules in the chassis are tight. This step assures that the space created by the removed supervisor engine is maintained.

Note If the captive installation screws are loose, the electromagnetic interference (EMI) gaskets on the installed modules will push the modules toward the open slot, reducing the opening size and making it difficult to install the replacement module.

Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note

 

78-16162-02

17

 

 

 

Image 17
Contents Product Number WS-6509-NEB-UPGRD= Safety Overview ContentsRequired Tools Parts ListShutting Down the System Installation GuidelinesAC-Input Systems Replacing the Panel Safety CoverPanel handle Replacing the Fan Tray Installing the Panel Safety CoverRemoving the Fan Tray Removing the Fan TrayHigh Speed FAN Installing the High Speed Fan TrayRemoving an AC-Input Power Supply Replacing the Power SupplyRemoving an AC-Input Power Supply 3000 Watt AC-Input Power Supply Front Panel Installing the 3000 W AC-Input Power SupplyConnecting Power to the Fan Tray Connecting Power to the Fan TrayCable Connectors Installing the Fan Tray Power Cable for AC-Input SystemsTerminal block covers Connecting Site Power to the Fan Tray for DC-Input SystemsRemoving the Terminal Block Cover Removing the Supervisor Engine Replacing the Supervisor EngineInstalling the Supervisor Engine Positioning the Supervisor Engine in the Chassis Clearing the EMI Gasket in the Chassis AC-Input Systems Powering Up the SystemDC-Input Systems Verifying InstallationObtaining Documentation Related DocumentationCisco.com Product Documentation DVDOrdering Documentation Documentation FeedbackCisco Product Security Overview Obtaining Technical Assistance Reporting Security Problems in Cisco ProductsCisco Technical Support & Documentation Website Submitting a Service RequestObtaining Additional Publications and Information Definitions of Service Request SeverityObtaining Additional Publications and Information