Contents
C H A P T E R 2 | Switch Installation |
|
| Warnings |
|
| Installation Guidelines | |
| Verifying Switch Operation | |
| Installing the Switch |
Mounting into a Rack |
|
| |
.Mounting Brackets |
|
| |
Attaching Brackets for | |||
Attaching Brackets for | |||
Attaching Brackets for | |||
Attaching Brackets for ETSI Racks | |||
Mounting the Switch into a Rack |
| ||
|
|
|
|
Attaching Brackets for Wall Mounting | |||
Installing and Removing SFP Modules |
|
| |
Installing SFP Modules |
|
| |
Removing SFP Modules |
|
|
| Inserting and Removing the SFP Module Patch Cable | ||||||
| Removing the SFP Module Patch Cable |
| |||||
| Replacing the SD Flash Memory Card |
| |||||
| Connecting Devices to the Ethernet Ports |
| |||||
| Connecting to the 10/100 and 10/100/1000 Ports | ||||||
| Connecting to the 10/100 PoE Ports |
| |||||
| Where to Go Next |
|
|
|
|
|
|
| Power Supply Installation |
|
|
|
|
|
|
C H A P T E R 3 |
|
|
|
|
| ||
| Power Supply Modules |
|
|
|
|
| |
| Power Supply Module Installation |
|
|
| |||
| Installation Guidelines |
|
|
|
| ||
| Installing a Power Supply Module |
| |||||
| Equipment That You Need |
|
|
|
| ||
| Grounding the Switch |
|
|
|
|
| |
| Installing the Power Supply Module in the Switch | ||||||
| Wiring the Power Source |
|
|
|
| ||
| Removing the Power Supply Module |
|
|
Cisco CGS 2520 Hardware Installation Guide
| iv |
| |
|
|