Chapter 1 Managing Single Entities
Examples
To power off anIP phone connected to a PoE port:
Switch# configure terminal
Enter configuration commands, one per line. End with CNTL/Z.
Switch(config)# energywise domain cisco security
Switch(config)# interface gigabitethernet0/2
The switch powers the IP phone regardless of whether or not EnergyWise is enabled.
Automatically Managing Power
The lab IP phones automatically power on at 0800 and power off at 2000.
Switch# configure terminal
Enter configuration commands, one per line. End with CNTL/Z.
Switch(config)# energywise domain cisco security
Switch(config)# interface gigabitethernet1/0/3
Switch# show energywise recurrences
Id | Addr | Class Action | Lvl | Cron |
|
| |
|
| ||||||
1 | Gi0/3 | QUERY | SET | 10 | minutes: 0 | hour: | 8 day: * month: * weekday: * |
2 | Gi0/3 | QUERY | SET | 0 | minutes: 0 | hour: | 20 day: * month: * weekday: * |
Switch# show
energywise level 10 recurrence at 0 8 * * *
energywise level 0 recurrence at 0 20 * energywise importance 50
energywise role role.labphone energywise name labInterface.3
end
<output truncated>
|
| The PCs on the first floor automatically power on at 0600 and power off at 2000. | |||
|
| Switch# configure terminal | |||
|
| Enter configuration commands, one per line. End with CNTL/Z. | |||
|
| Switch(config)# energywise domain cisco security | |||
|
| 43440 ip 2.2.4.30 | |||
|
| Switch(config)# | |||
|
| ||||
|
| ||||
|
| ||||
|
| Switch(config)# | |||
|
| ||||
|
| ||||
|
| ||||
|
| Cisco EnergyWise Configuration Guide |
|
| |
|
|
| |||
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|