Chapter 2 Preparing for Installation
Table |
|
|
|
| |
|
|
|
|
| |
Task No. | Planning Activity | Verified by | Time | Date | |
|
|
|
|
| |
3 | Power evaluation: |
|
|
| |
| • | Input power type |
|
|
|
| • Receptacle proximity to the equipment |
|
|
| |
| • Dedicated (separate) circuits for redundant |
|
|
| |
|
| power supplies |
|
|
|
| • UPS for power failures |
|
|
| |
|
|
|
|
| |
4 | Grounding evaluation: |
|
|
| |
| • | Circuit breaker size |
|
|
|
|
|
|
|
| |
5 | Cable and interface equipment evaluation: |
|
|
| |
| • | Cable type |
|
|
|
| • | Connector type |
|
|
|
| • | Cable distance limitations |
|
|
|
| • | Interface equipment (transceivers) |
|
|
|
|
|
|
|
| |
6 | EMI evaluation: |
|
|
| |
| • Distance limitations for signaling |
|
|
| |
| • | Site wiring |
|
|
|
| • | RFI levels |
|
|
|
|
|
|
|
|
|