Site Planning

Air Flow Guidelines for Enclosed Rack Installation

To install a Cisco ASR 903 Router in a 4-post enclosed cabinet, the front and rear doors of the cabinet must be removed or be perforated with a minimum of 65% open area (70% for ETSI 800mm racks).

If you are mounting the chassis in a 4-post enclosed cabinet, ensure that you have a minimum of 6 inches (15.24 cm) of clearance on each side of the chassis.

Floor Loading Considerations

Ensure that the floor under the rack supporting the Cisco ASR 903 Routers is capable of supporting the combined weight of the rack and all the other installed equipment.

To assess the weight of a fully configured Cisco ASR 903 Router, refer to “System Specifications” section on page 1-2.

For additional information about floor loading requirements, consult GR-63-CORE, Network Equipment Building System (NEBS) Requirements: Physical Protection.

Site Power Guidelines

The Cisco ASR 903 Router has specific power and electrical wiring requirements. Adhering to these requirements ensures reliable operation of the system. Follow these precautions and recommendations when planning your site power for the Cisco ASR 903 Router:

The redundant power option provides a second, identical power supply to ensure that power to the chassis continues uninterrupted if one power supply fails or input power on one line fails.

In systems configured with the redundant power option, connect each of the two power supplies to a separate input power source. If you fail to do this, your system might be susceptible to total power failure due to a fault in the external wiring or a tripped circuit breaker.

To prevent a loss of input power, be sure that the total maximum load on each circuit supplying the power supplies is within the current ratings of the wiring and the breakers.

Check the power at your site before installation and periodically after installation to ensure that you are receiving clean power. Install a power conditioner if necessary.

Provide proper grounding to avoid personal injury and damage to the equipment due to lightning striking power lines or due to power surges. The chassis ground must be attached to a central office or other interior ground system.

Caution This product requires short-circuit (overcurrent) protection, to be provided as part of the building installation. Install only in accordance with national and local wiring regulations.

Note The Cisco ASR 903 Router installation must comply with all the applicable codes and is approved for use with copper conductors only. The ground bond fastening hardware should be of compatible material and preclude loosening, deterioration, and electrochemical corrosion of hardware and joined material. Attachment of the chassis ground to a central office or other interior ground system must be made with a 6 AWG gauge wire, copper ground conductor at a minimum.

 

Cisco ASR 903 Router Hardware Installation Guide

2-12

OL-25178-05

Image 46
Contents Cisco ASR 903 Router Hardware Installation Guide Page N T E N T S Site Planning RSP Installation Troubleshooting Fan Tray LEDs Viii Document Revision History Revision Date Change SummaryDocument Conventions Document AudienceDocument Organization Title DescriptionObtaining Documentation and Submitting a Service Request Xii Cisco ASR 903 router Features A P T E RSystem Specifications Cisco ASR 903 router Chassis DesignPower Supply Features Dying Gasp DC Power SpecificationsRedundancy Status LEDsEuro-style connector AC Power Specifications Fan TrayFan Tray A903-FAN Fan Tray A903-FAN-EAir Plenum Dust Filter A903-FAN-FRSP Modules Supported RSPsNetwork Timing Interfaces Supported RSP FeaturesRSP Redundancy RSP InterfacesInterface Modules Label InterfaceGigabit Ethernet SFP Interface Module Supported SFP ModulesGigabit Ethernet RJ45 Interface Module SFP-GE-ZGigabit Ethernet XFP Interface Module Supported XFP ModulesXFP-10GER-OC192IR XFP-10GER-OC192IR-RGD T1/E1 Interface Module OC-3 Interface ModuleSerial Interface Module 11shows the interface module12 Serial Interface Module Supported Standards Standard DefinitionInterface Numbering Temperature SensorSerial Number Label Location Regulatory Compliance Cisco ASR 903 router Overview Regulatory ComplianceOL-25178-05 Preparing for Installation Safety GuidelinesStandard Warning Statements Safety Precautions for Module Installation and Removal Safety with Electricity Page OL-25178-05 Preparing for Installation Safety Guidelines Power Supply Considerations Preventing ESD DamageSite Planning Checklist General PrecautionsSite Planning Site Selection Guidelines Physical CharacteristicsEnvironmental Requirements Air Flow Guidelines Air exhaust Room airAir Flow Guidelines for Enclosed Rack Installation Site Power GuidelinesFloor Loading Considerations Electrical Circuit Requirements Site Cabling GuidelinesHardware components Electromagnetic Interference Asynchronous Terminal ConnectionsInterference Considerations Radio Frequency InterferenceRack-Mounting Guidelines Precautions for Rack-MountingLightning and AC Power Fault Interference Rack Selection GuidelinesLocating for Easy Maintenance Locating for SafetyEquipment Rack Guidelines Locating for Proper Airflow Installation Checklist Verified Task DateReceiving the Cisco ASR 903 Router Creating a Site LogChassis-Lifting Guidelines Tools and EquipmentUnpacking and Verifying the Shipped Contents Component Description Installing the Router in a Rack PrerequisitesInstalling the Chassis Brackets Attaching Mounting Brackets for a 19-inch EIA RackInstalling the Router Chassis in the Rack Installing the Chassis in a 19-inch EIA RackInstalling the Chassis in the Air Plenum Installing the Chassis in a 300 mm Etsi CabinetAttaching the Cable Management Brackets Cisco ASR 903 Chassis with Air PlenumCable Management Bracket Installation Installing the Chassis Ground Connection Grounding lug 300 mm Etsi cabinet11 Stripping a Ground Wire 12 Crimping a Ground Lug onto the Ground Wire Installing the Fan Tray Installing the Dust FilterRemoving and Replacing the Fan Tray Dust Filter MaintenanceRemoving the Dust Filter 14 Detaching the Fan Tray RSP Installation 15 Fan Tray RemovalInstalling an RSP Module 16 Cisco ASR 903 Router RSP InstallationRemoving an RSP Module Hot-Swapping an RSP Module Interface Module Installation Installing an Interface ModuleRemoving an Interface Module Hot-Swapping an Interface ModuleInstalling the Power Supply Power Connection Guidelines Preventing Power LossGuidelines for DC-Powered Systems Guidelines for AC-Powered Systems Installing the DC Power SupplyInstalling the DC Power Supply Module Installing Terminal Block on the DC PEM Unit A900-PWR550-D 18 Installing the DC Power Supply19 DC Power Supply with Lead Wires 20 Torquing the DC Power Supply Terminal Block Plug Screws Tools Removing and Replacing the DC Power Supply Activating the DC Power SupplyInstalling the AC power Supply Installing the AC Power Supply Module Activating the AC Power SupplyRemoving and Replacing the AC Power Supply Supply has been removed or replacedConnecting the Cisco ASR 903 Router to the Network Connecting Console CablesConnecting to the Serial Port using Microsoft Windows 2404 Connecting to the Console Port using Linux Connecting to the Console Port using Mac OSTo disconnect the OS X USB console from the Terminal window Installing the Cisco Microsoft Windows XP USB Driver Installing the Cisco Microsoft Windows USB Device DriverInstalling the Cisco Microsoft Windows 2000 USB Driver Using the Add Remove Programs Utility Uninstalling the Cisco Microsoft Windows USB DriverInstalling the Cisco Microsoft Windows Vista USB Driver Using the Setup.exe ProgramConnecting to the Auxiliary Port Uninstalling the Cisco Microsoft Windows Vista USB Driver25 Connecting a Modem to the Cisco ASR 903 Router Installing and Removing SFP and XFP Modules Connecting a Management Ethernet CableConnecting a USB Flash Device Connecting Cables to the Bits Interface Connecting Timing CablesRemoving a USB Flash Device Cisco ASR 903 Router Hardware Installation Guide Connecting Cables to the Output 10Mhz or 1PPS Interface Connecting Cables to a GPS InterfaceConnecting Cables to the Input 10Mhz or 1PPS Interface Connecting Cables to the ToD InterfaceConnecting Ethernet Cables Connecting T1/E1 cables Connecting Cables to SFP ModulesInstalling the Cable Connector Connecting Cables to the Patch Panel RJ45 Cable PinoutsConnecting Serial Cables Recommended Patch PanelCable Type Product Number Length Male/Female Connector EIA/TIA-530 DTE CAB-SS-530FCConnecting the Fan Tray Alarm Port Connector and Cable SpecificationsOL-25178-05 Cisco ASR 903 Router Initial Configuration Checking Conditions Prior to System StartupPowering Up the Cisco ASR 903 Router Example 4-1 Loading the Default System Boot ImageCisco ASR 903 Router Hardware Installation Guide OL-25178-05 CPP Verifying the Front Panel LEDs Configuring the Cisco ASR 903 Router at StartupVerifying the Hardware Configuration Checking Hardware and Software CompatibilityUsing the Console Interface Configuring Global ParametersChecking the Running Configuration Settings Saving the Running Configuration to NvramSafely Powering Off the Cisco ASR 903 Router Pinouts Pin Signal Name Direction DescriptionBits Port Pinout Time of Day Port Pinout GPS Port PinoutMhz input and output 1PPS input and output Pin Signal Name Description Alarm Port PinoutConsole/Aux RJ45 RS232 Serial Port Pinout Board Telco Jack Line PIns Signal Name Pin Pins T1/E1 Port PinoutSerial Cable Pinouts RJ-45 Connector Pinouts DB-9 Connector PinoutsPin Standard DB-9 Direction Description RS-485 USB Console Port Pinout Management Ethernet Port PinoutUSB Flash/MEM Port Pinout LED Summary Fiber-Optic SpecificationsRSP LEDs Interface Module LEDs Color/State Description two LEDs for eachT1/E1 portOC-3 Interface Module LEDs Color/State DescriptionSerial Interface Module LEDs T1/E1 Interface Module LEDsLED Label Color/State Meaning Power Supply LEDs Color/State MeaningAlarm Type Alarm Meaning Alarm ConditionsFan Tray LEDs OL-25178-05 Site Log and Manufactures P E N D I XDate InitialsManufactures Manufacturer Web Site or Phone Number Products/ModelOL-25178-05 D E IN-2
Related manuals
Manual 118 pages 26.92 Kb