Installing The
3.With the rack mounting brackets installed, position the
19-Inch Rack
EMC39-12 Ethernet Media Converter WITH LANVIEW
TPLINK
XMT | RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX |
RCV
PWR FOLNK
12 11 10 9 8 7 6 5 4 3 2 1 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 |
Screws (4)
Figure 2-2 Installing the EMC39-12 in a 19-Inch Rack
2.2.2 Free-Standing Shelf or Tabletop Installation
Figure 2-3 shows the surface requirements for installing the EMC39-12 on a shelf or tabletop. Shelving units must support 30 pounds of static weight. Before you install the EMC39-12, ensure the power source and environmental conditions meet the requirements specified in Chapter 1, Introduction.
6 IN.
18 IN. |
|
|
|
| 21 IN. |
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| ||||||||
TPLINK |
|
|
|
|
|
|
|
|
|
|
|
|
XMT | RX TX | RX TX | RX TX | RX | TX RX TX | RX TX | RX TX | RX TX | RX TX | RX TX | RX TX | RX TX |
RCV | ||||||||||||
PWR FOLNK |
|
|
|
|
|
|
|
|
|
|
|
|
12 11 10 9 8 7 6 5 4 3 2 1 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 |
|
7 FT.
Figure 2-3 Shelf or Tabletop Installation
| Page |