
Installing The 
3.With the rack mounting brackets installed, position the 
19-Inch  Rack
EMC39-12 Ethernet Media Converter WITH LANVIEW
TPLINK
XMT  | RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX RX TX  | 
RCV
PWR 
 FOLNK
12 11 10 9 8 7 6 5 4 3 2 1  | 12  | 11  | 10  | 9  | 8  | 7  | 6  | 5  | 4  | 3  | 2  | 1  | 
Screws (4)
Figure 2-2  Installing the EMC39-12  in a 19-Inch  Rack
2.2.2 Free-Standing  Shelf or Tabletop Installation
Figure 2-3  shows the surface requirements for installing the EMC39-12  on a shelf or tabletop. Shelving units must support 30 pounds of static weight. Before you install the EMC39-12,  ensure the power source and environmental conditions meet the requirements specified in Chapter 1, Introduction.
6 IN.
18 IN.  | 
  | 
  | 
  | 
  | 21 IN.  | 
  | 
  | 
  | 
  | 
  | ||
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | |
  | 
  | 
  | 
  | 
  | ||||||||
TPLINK  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
XMT  | RX TX  | RX TX  | RX TX  | RX  | TX RX TX  | RX TX  | RX TX  | RX TX  | RX TX  | RX TX  | RX TX  | RX TX  | 
RCV  | ||||||||||||
PWR FOLNK  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
  | 
12 11 10 9 8 7 6 5 4 3 2 1  | 12  | 11  | 10  | 9  | 8  | 7  | 6  | 5  | 4  | 3  | 2  | 1  | 
  | ||||||||||||
7 FT.
Figure 2-3  Shelf or Tabletop Installation
 | Page   |