Cabletron Systems SEH100TX-22 manual Stacking SEH Hubs with an Sehi

Page 30

Chapter 4: Installation

4.4.1Stacking SEH Hubs with an SEHI

Follow the procedures in this section if you are using an SEHI to manage an SEH stack:

NOTE

The SEH and the SEHI have universal power supplies that allow connection to power sources from 100 Vac to 125 Vac @ 4.0 A or 200 Vac to 250 Vac @ 2.0 A, 50/60 Hz.

1.Power up the SEHI by plugging the power cord into the back panel of the SEHI and plugging the other end into a grounded receptacle.

NOTE

Locate the SEHI at the bottom of the stack.

For management purposes, stacked hubs are always numbered from 1 to 5 starting at the bottom.

2.Verify that the PWR LED is on, indicating that the SEHI is receiving power. After the SEHI runs a self test and completes the boot process successfully, the CPU LED blinks green indicating normal operation. If the LED remains red, the processor is faulty; contact Cabletron Systems Technical Support. Do not proceed with the following steps until the CPU LED is a steady blinking green.

Do NOT power up or interconnect any other hubs in the stack

!until the SEHI has successfully completed the boot process.

CAUTION

Also, do NOT connect the interconnect cable between the SEH and the SEHI before powering up the SEH. Otherwise, damage to the SEH may result.

3.Power up the SEH above the SEHI in the stack by plugging the power cord into the back panel of the SEH and plugging the other end into a grounded receptacle.

4.Verify that the PWR LED is on, indicating that the SEH is receiving power.

4-6

SEH100TX User’s Guide

Image 30
Contents 100BASE-T Stackable HUB USER’S Guide Page SEH100TX User’s Guide DOC Notice Cabletron Software Program License Declaration of Conformity Contents Contents Using this Manual Chapter IntroductionDocument Conventions Following conventions are used throughout this documentGetting Help Your email addressRelated Manuals Chapter SEH Features and Options HubSTACK 100BASE-TX HUB with Lanview SEH100TX-22SEH Features SEH OverviewStackable Capabilities Rack Mounting CapabilitiesOptional EPIMs EpimChapter Installation Requirements Specifications Cable SpecificationsHubSTACK Interconnect Cable Requirements UTP Cable Specifications Multimode Fiber Optic Cable Specifications Network Cable Lengths Class I NetworkNetwork Port Specifications RJ45 Network Port PinoutsOperating Specifications Agency ApprovalsPhysical Specifications ImmunitySEH100TX User’s Guide Chapter Installation Unpacking the SEHTabletop or Shelf Installation HubSTACK 100BASE-TX HUB with Lanview SEH100TX-22Rackmount Installation Screws Strain-Relief BracketRack Mounting the SEH Powering UP and Stacking the SEH Powering Up and Stacking the SEHStacking SEH Hubs with an Sehi Repeat steps 3 through 6 until all SEH hubs are connected Installing AN Epim Stacking Unmanaged SEH Hubs TogetherInstalling an Epim SEH100TX User’s Guide Chapter Connecting to the Network Connecting the SEH100TX-22 to the NetworkConnecting to Network Ports Connecting to an EPIM-100TX SEH Network PortsPosition X crossed over RX+ TX+ Position = Not crossed over Nnecting an EPIM-100FX or EPIM-100FMB Testing the Installation EPIM-100FX PortSEH100TX User’s Guide Chapter Troubleshooting Installation TestUsing Lanview SEH100TX-22 Epim 1 RCV LED Epim 2 RCV LED Epim Specifications Appendix a Epim InformationEPIM-100TX EPIM-100FX EPIM-100FMB Figure A-3 EPIM-100FMBTable A-2 provides the specifications for the EPIM-100FMB Index NumericsIndex-2 SEH100TX User’s Guide Power Supply Cord