Pelco Dx8000 manual C1607M 6/04

Page 29

f.Wait while the DX8000 prepares the newly installed drives for video storage. You will see the following progress bar while the formatting is underway.

Figure 27. PDB Database Creation Progress Bar

4.After the storage allocation procedure is complete, the DX8000 will reboot automatically and the unit will be ready to resume service.

C1607M (6/04)

27

Image 29
Contents DX8000 Page Tools Needed Parts ListIntroduction Getting Ready Removing Power Cord from WallRemoving Power Cord from Unit ESD Protection Open the Unit Chassis Preparing Unit for Drive InstallationRemoving Chassis Cover DX8000 Interior Component LayoutRemoving Front Cross-Brace Move the Front Cross-BracePlacing Front Cross-Brace Across Rear of Unit Removing IDE Data Cables Disconnect the Data Cable and Power WireRemoving Hard Drive Power Connection Removing Hard Drive Basket Remove the Drive Mount BasketsPrepare the Drives Install an Additional DriveInserting Drives into Basket Mount the Additional DriveReplacing Drive Basket SET the Master / Slave Jumpers Setting Drive Jumpers Installing CD-RW Data Cable Reconnect the Data and Power CablesInstall Hard Drive Data Cables Installing Hard Drive Power Connectors Replacing Front Cross-Brace Reassemble the UnitReplacing Chassis Cover Restarting Unit Opening List of Drives Preparing the New Drives to Store DataSelecting Allocation Option for Each Drive Format Warning Dialog Box C1607M 6/04 C1607M 6/04 Product Warranty and Return Information ISO9001
Related manuals
Manual 36 pages 35.01 Kb Manual 10 pages 26.21 Kb Manual 40 pages 3.7 Kb Manual 1 pages 21.57 Kb