Server Installation Process Overview
To install your server into a four-post rack using the slide-rail and cable management arm options, perform the following tasks in the order shown:
1.“Checking Compatibility” on page 11
2.“Disassembling Slide-Rails” on page 12
3.“Installing the Mounting-Brackets Onto the Server” on page 14
4.“Installing the Cable Management Arm” on page 21
5.“Verifying Operation of the Slide-rails and CMA” on page 28
6.“Connecting the Cables” on page 31
Rail Assemblies
The server might include either tool-less or bolt-on rail assemblies in rackmount kits. Instructions for both types are included in this chapter.
Service Label
Refer to the service label on the Sun Fire X4150 server top cover for instructions on how to install your server into a four-post rack, using the slide-rail and cable management arm options. The service label includes instructions for both tool-less and bolt-on rail assemblies.
10 Sun Fire X4150 Installation Guide • January 2008