INSTALLING THE VTL VALUE APPLIANCE IN AN EQUIPMENT RACK
4.Using a level (D above), align the server with the rails, and insert the inner rails into the middle rails at the correct angle (E below).
E
5.Have an assistant stand at the rear of the rack.
6.As you push the server into the rack, the assistant makes sure that the inner rails are engaged with the
The assistant makes sure that the rails are NOT merely pushing the
FG
7.If there are problems, support the server with the mechanical lift, and realign the
8.Once the inner rails are correctly engaged and riding on the bearings, slide the server all the way into the rack to set the rail locks.