CABLING
2.Route power, SAN, and LAN cables to the server through the CMA cable hangers (B below).
You need to route the following cables:
■one Ethernet LAN cable for the NETMGT port
■up to four Ethernet LAN cables for the LAN ports (NET0, NET1, NET2, and NET3).
■optical Fibre Channel cables for each SAN client (backup server).
A
B
3.Connect the power cords to the connectors on the power supplies, and secure them to the chassis using the clips provided (C below).
F
PORT 1 |
Tx |
Rx |
PORT 2 |
Tx |
Rx |
FIBRE |
CHANNEL |
PORT 1
Tx
Rx
PORT 2
Tx
Rx
FIBRE
CHANNEL
C
D
C
E
4.Route Ethernet LAN cables to the NETMGT port (D above) and the LAN ports, NET0, NET1, NET2, and NET3 (E), but do not connect them yet.
Wait to connect Ethernet cables until after LAN connectivity has been configured.
316196101 • A | Chapter 1 Installing VTL Value hardware 21 |