Patton electronic 4630 Series manual Planning the installation, Site log, Network information

Page 24

SmartNode 4630 Getting Started Guide

3 • SmartNode installation

 

 

Planning the installation

Before installing the gateway router device, the following tasks should be completed:

Create a network diagram (see section “Network information” on page 24)

Gather IP related information (see section “IP related information” on page 24 for more information)

Install the hardware and software needed to configure the SmartNode. (See section “Software tools” on page 25)

Verify power source reliability (see section “Power source” on page 25).

After you have finished preparing for gateway router installation, go to section “Installing the gateway router” on page 25 to install the device.

Site log

Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not already keep such a log. Site log entries should include information such as listed in table 4.

 

Table 4. Sample site log entries

 

 

Entry

Description

 

 

Installation

Make a copy of the installation checklist and insert it into the site log

 

 

Upgrades and maintenance

Use the site log to record ongoing maintenance and expansion history

 

 

Configuration changes

Record all changes and the reasons for them

 

 

Maintenance

Schedules, requirements, and procedures performed

 

 

Comments

Notes, and problems

 

 

Software

Changes and updates to SmartWare software

 

 

Network information

Network connection considerations that you should take into account for planning are provided for several types of network interfaces are described in the following sections.

Network Diagram

Draw a network overview diagram that displays all neighboring IP nodes, connected elements and telephony components.

IP related information

Before you can set up the basic IP connectivity for your SmartNode 4630 you should have the following infor- mation:

IP addresses used for Ethernet LAN and WAN ports

Subnet mask used for Ethernet LAN and WAN ports

Planning the installation

24

Image 24
Contents SmartNode 4630 Series Mailsupport@patton.com Summary Table of Contents Table of Contents Contacting Patton for assistance Cabling List of Figures List of Tables About this guide AudienceStructure Precautions Safety when working with electricityTypographical conventions used in this document General observationsGeneral conventions Node Chapter contents General informationSmartNode 4630 overview SmartNodeSmartNode 4630 rear panel BRI 0/060 Hz Reset BRI 0/1BRI 0/2 BRI 0/3Power SmartNode 4630 front panelRun VoIP Link BRI Link/SigEthernet Link Ethernet 100MApplications overview Introduction Application-Edge intelligence of enterprise communicationApplication-Multi-service Isdn Internet telephony IAD How it worksApplications overview SmartNode installation Planning the installation Network DiagramSite log Network informationInstalling the gateway router Connecting the 10/100Base-T Ethernet LAN and WAN cables Connecting the power supply Initial configuration Connecting the SmartNode to your laptop PC Connecting the SmartNode to your laptop PCFactory-default IP settings LoginConfiguring the desired IP address Changing the WAN IP addressConnecting the SmartNode to the network Connecting the SmartNode to the networkLoading the configuration optional Bootloader Start BootloaderStart-up with factory configuration Load a new application image SmartWare via TftpOptional RedBoot load -r -v -h host -b RedBoot load -r -v -m Load a new application image SmartWare via the serial linkXmodem ymodem -b Additional information Contacting Patton for assistance Warranty coverage Contact informationPatton support headquarters in the USA Out-of-warranty service RMA numbersAppendix a Compliance information Safety ComplianceRadio and TV Interference CE Declaration of ConformityIsdn compliance Appendix B Specifications Voice processing signalling dependent Voice connectivityData connectivity Voice signalling Fax and modem supportVoice routing-session router IP services ManagementSystem PhysicalIdentification of the SmartNode devices via Snmp SmartNode Model SysObjectIDAppendix C Cabling Connecting a serial terminal ConsoleTypical Ethernet straight-through cable diagram EthernetIsdn BRI Appendix D Port pin-outs Console port Isdn BRI 0/0 NT/Net or TE/User portIsdn BRI 0/1 . /3 TE/Usr or NT/Net Appendix E SmartNode 4630 factory configuration Introduction Appendix F End user license agreement End User License Agreement Termination Other licenses